Method for manufacturing high-strength hot rolled bulletproof steel plate
A manufacturing method and hot-rolled sheet technology, applied in the field of metal materials, can solve the problems of poor plate shape and cold workability, increased alloy cost, reduced strength, etc., and achieve the effects of good welding performance, low alloy cost and moderate hardness
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0021] The main chemical composition (%) of continuous casting billet of table 1
[0022] Referring to Table 1, the A-1, A-2 and A-3 embodiments are operated. Step 1, smelting and casting to obtain a continuous casting slab with qualified components, sending the continuous casting slab into a heating furnace for heating, and the heating temperature of the heating furnace is 1250°C; Step 2, hot rolling the heated continuous casting slab, the hot rolled The starting rolling temperature is 1020°C, and the final rolling temperature is 850°C; step 3, cooling the hot-rolled continuous casting billet at a laminar cooling rate of 30°C / s; coiling the cooled continuous casting billet to obtain hot Roll the plate, the coiling temperature is 550°C, the thickness of the obtained hot-rolled plate is 3.0mm; Step 5, heat-treat the hot-rolled plate to obtain bulletproof steel plate, heat the hot-rolled plate at 920°C for 10 minutes, water quench, and then pass through 300 After temperi...
Embodiment 2
[0027] Step 1, smelting and casting to obtain a continuous casting slab with qualified components, sending the continuous casting slab into a heating furnace for heating, and the heating temperature of the heating furnace is 1200°C; Step 2, hot rolling the heated continuous casting slab, the hot rolled The starting rolling temperature is 1000°C, and the finishing rolling temperature is 840°C; step 3, cooling the hot-rolled continuous casting slab at a laminar cooling rate of 25°C / s; coiling the cooled continuous casting slab to obtain hot Rolling the plate, the coiling temperature is 480°C, the thickness of the obtained hot-rolled plate is 2.0mm; step 5, heat-treating the hot-rolled plate to obtain a bullet-proof steel plate, the hot-rolled plate is kept at 850°C for 13 minutes, water quenched, and then subjected to 300 After tempering at ℃ for 3 minutes, air-cool to obtain a bulletproof steel plate.
Embodiment 3
[0029] Step 1, smelting and casting to obtain a continuous casting slab with qualified components, sending the continuous casting slab into a heating furnace for heating, and the heating temperature of the heating furnace is 1230°C; Step 2, hot rolling the heated continuous casting slab, the hot rolled The starting rolling temperature is 1100°C, and the finishing rolling temperature is 900°C; step 3, cooling the hot-rolled continuous casting slab at a laminar cooling rate of 35°C / s; coiling the cooled continuous casting slab to obtain hot Roll the plate, the coiling temperature is 500°C, and the thickness of the obtained hot-rolled plate is 2.5mm; step 5, heat-treat the hot-rolled plate to obtain a bullet-proof steel plate, heat the hot-rolled plate at 930°C for 10 minutes, water quench, and then pass through 300 After tempering at ℃ for 6 minutes, air-cool to obtain a bulletproof steel plate.
[0030] The manufacturing method of the high-strength hot-rolled bulletproof steel ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com