Business scheduling method and device, and fusion equipment
A technology for service scheduling and integration of equipment, applied in the field of communication networks, can solve problems such as equipment integration limitations, and achieve the effects of flexible provision, efficient service carrying and scheduling methods, and optimized efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039] This implementation mode provides a service scheduling system for a content distribution node and a network fusion device, including the following content:
[0040] (a) The CDN content distribution node and network service control equipment are integrated, and the CDN content distribution node is used as a component of the network device (in the form of a service board) for unified deployment. The fusion device is managed by a unified central management platform;
[0041] (b) The CDN component of the fusion device includes a business processing unit and a storage unit, and may also include an external storage device, which is connected to the external storage device through iSCSI, FC, and FCoE interfaces to form a unified external content distribution service node;
[0042] (c) In order to better integrate equipment resources, improve resource utilization efficiency, and provide differentiated services; use business service unit groups to organize resources and process ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com