Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Rapid-construction method for rapid change of small-section into large-section tunnel

A construction method and large-section technology, applied in tunnels, earth-moving drilling, mining equipment, etc., can solve the problems of narrow working face of small pilot pit, unfavorable ballast discharge, feeding, and high safety hazards, and achieve construction safety and stability. Strong, good social and economic benefits, the effect of tunnel deformation control

Inactive Publication Date: 2007-04-25
CHINA TIESIJU CIVIL ENG GRP CO LTD +1
View PDF0 Cites 23 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0008] 1. The climbing of the small pilot pit is long, and the cost of temporary support is high;
[0009] 2. The working surface of the small pilot pit is narrow, which is not conducive to the discharge and feeding of materials, the ventilation is difficult, the construction period is long, and the construction period is difficult to guarantee;
[0010] 3. After the small pilot pit is formed, the reverse expansion construction must break the temporary support, and carry out secondary disturbance to the surrounding rock of the tunnel. The construction risk is high and the safety hazard is relatively large.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Rapid-construction method for rapid change of small-section into large-section tunnel
  • Rapid-construction method for rapid change of small-section into large-section tunnel
  • Rapid-construction method for rapid change of small-section into large-section tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0037] See Fig. 2 and Fig. 3. After the excavation of the tunnel, after the opening of the working face of the large section of the turnout area from the A-type standard right-line tunnel at the southern end, the small pilot pit on the right side of the excavation surface of the section continues to the north with double-sided tunneling. Excavate the upper and lower chambers on the right side of the G-shaped section tunnel by wall pilot pit method, and stop progressing to another small F section mutation in front, forming a large cross-section right side wall pilot pit;

[0038] Then use the upper and lower side wall chambers on the right side of the G-shaped section that have been formed to open a transverse pilot pit 1 in the large section, so that the initial support of the entire G-shaped large section is included in the clearance of the transverse pilot pit 1, and the horizontal guide pit 1 is carried out horizontally. Excavation support reaches the outermost edge of the l...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a quick construction method that small section is changed to big section in tunnel construction abruptly, characterized in that first of all, small heading on the one side of small section is transited to side heading on the relative side of big section; then by the portrait space formed in side heading of the big section transverse heading is dug on the big section; permanent early support for the big section is constructed in the transverse heading so as to form permanent early closed ring for all section; the whole early support for big section is in the transverse heading; digging and support for big section tunnel is constructed on the front and back ends of the big section in the working plane formed by the transverse heading. The invention is provided with low cost, good safety and simple construction technology so on.

Description

Technical field: [0001] The invention relates to a construction method for tunnels with abrupt cross sections from small to large. Background technique: [0002] As shown in Figure 1, in the construction of subway tunnels, the transition from a standard section with an excavation size of 5.8×6.23m to a large section with a maximum excavation size of 13.950×9.354m is the boundary between the standard section and the crossover tunnel. Use a small pilot pit to construct first, and then reverse expansion after reaching the turnout section. The specific method is to operate according to the following steps: [0003] 1. From the double-arch middle hole (mileage YK15+159), start the temporary small pilot pit construction. [0004] 2. When the small pilot pit is constructed to the B-shaped section (mileage YK15+200), the small pilot pit begins to climb and expand. [0005] 3. After passing through the 14m-long climbing section, the small pilot pit was expanded into a B-shaped sect...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21D9/01
Inventor 杨仲杰邓敦义王福林杨建新付国才黄龙光杨慧丰刘庆丰彭友全
Owner CHINA TIESIJU CIVIL ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products