Water-rich stratum tube well dense arrangement dewatering construction method
A construction method and technology for water-rich strata, applied in infrastructure engineering, construction, etc., can solve the problems of inability to dewater the foundation pit, low construction efficiency, complicated operation, etc. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0020] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0021] A construction method for densely arranged tube wells in a water-rich formation, comprising the steps of:
[0022] S1. Check the inrush stability according to the actual situation on site. When precipitation is required, check the historical data of the rise and fall of the local water level and the highest water level, combined with the data of the deep underground sand layer on the site, according to the construction period, on the premise of meeting the precipitation requirements Next, the arrangement of tube wells is optimized to avoid hidden dangers to the waterproofing of the main structure caused by too dense tube wells, and the position of each tube well is obtained.
[0023] Such as figure 1 As shown, in this embodiment, when checking the surge stability, the calculated value K of the surge stability safety factor is obtained first, and...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com