Engineering pile length batch pre-judgment method based on BIM technology
A technology for engineering piles and pile lengths, applied in special data processing applications, instruments, electrical digital data processing, etc., can solve problems such as low efficiency, cumbersome operation, and poor calculation accuracy.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0038] Embodiments of the present invention are described below through specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the content disclosed in this specification. The present invention can also be implemented or applied through other different specific implementation modes, and various modifications or changes can be made to the details in this specification based on different viewpoints and applications without departing from the spirit of the present invention.
[0039] The present invention will be described in further detail below in conjunction with the accompanying drawings and specific examples.
[0040] An embodiment of the present invention provides a BIM technology-based batch prediction method for engineering pile lengths.
[0041] In the traditional technology, the method of predicting the length of engineering piles is mainly to use the "interpolation method" to estimate one by one ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com