Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Contract receivable management method for engineering project

A management method and accounts receivable technology, applied in data processing applications, instruments, finance, etc., can solve problems such as inconsistency in data caliber, difficulty in advancing, and unclear collection responsibilities

Pending Publication Date: 2021-05-11
BAOSTEEL ENG & TECH GRP
View PDF4 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] 1. Low integration of business and finance
At present, the engineering industry generally only manages the "accounts receivable" in the accounting books. The financial department manually counts the accounts receivable and sends them to the marketing department by email. The department confirms the implementation progress, and then collects from the customer; the financial department, the marketing department, and the production department have inconsistent data, there is no integration of business and finance, and each department repeats work. When hundreds or thousands of projects are carried out in parallel, manual multi-department statistics are confirmed. It is difficult to advance the work, and the accuracy of the data is low, which also greatly affects the efficiency of payment collection
[0005] 2. Responsibility for collection is not clear
The financial department tracks and manages the return of payment according to the "accounts receivable" in the accounting book, but the "accounts receivable" in traditional accounting can only show the amount formed by invoicing, and cannot truly and effectively reflect the contract terms of the project , implementation progress, owner’s confirmation, etc., cannot visually show the reasons for the formation of receivables, and the marketing department and production department will shuffle each other. The department believes that the management of accounts receivable is purely the responsibility of the marketing department, resulting in unclear ownership of rights, responsibilities, and interests, making collection difficult and slow
[0006] 3. Lack of technical means, people, technology, and data cannot be organically integrated. At present, the engineering industry generally still uses traditional manual methods for data processing, and manual notifications are made one by one. For hundreds or thousands of projects, all managers are notified. It takes more than a month to recover the feedback information, and at this time the project status and payment situation have already undergone great changes
[0007] Therefore, in the traditional way, manual ledgers are usually used. Different centralized managers in the financial, marketing, and production departments record project collection progress, execution progress, and billing status. Due to management requirements such as dynamic collection and real-time push, it is difficult to form a systematic and full-cycle tracking analysis of the project, the collection responsibility is not clear, the data between the business system and the financial system is scattered and stored, the level of business-financial integration is low, and project asset management exists. Pain points

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Contract receivable management method for engineering project
  • Contract receivable management method for engineering project
  • Contract receivable management method for engineering project

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0053] A contract accounts receivable management method for engineering projects, such as figure 1 As shown, implement in sequence as follows:

[0054] ① Maintenance of relevant information on the sales side of the operation and management sharing system:

[0055] ①.1 Basic information maintenance of sales contract:

[0056] The marketing manager maintains and enters the subject information of the sales contract in the operation and management sharing system, including: project number, customer code, contract name, contract, contract sub-items (including amount, tax rate), contract start and end dates, and contract receipts terms,

[0057] ①.2 Terms of planned maintenance:

[0058] According to the terms of the contract, the marketing manager will carry out the plan maintenance of the downward clauses of the sales contract, including: contract stage (including process, delivery, assessment, quality assurance), expense category (including design, equipment, construction and ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the field of electric digital data processing, in particular to a contract receivable management method for an engineering project. The contract receivable management method for the engineering project is characterized by being implemented according to the following steps in sequence: (1) maintenance of related information of a sales end of an operation management sharing system; (2) intelligent engineering platform data acquisition; and (3) the RPA intelligently pushes early warning. Information collection is timely, and tracking analysis is comprehensive.

Description

technical field [0001] The invention relates to the field of electrical digital data processing, in particular to a contract account receivable management method for engineering projects. Background technique [0002] Compared with manufacturing, retail, and service industries, the product (engineering project) capital investment in the engineering industry is generally higher, and the construction period of the project is generally longer, usually 2-3 years, and the process is based on advance payment and progress payment , Quality assurance payment collected in batches. In the traditional way, due to the inter-period settlement of the engineering industry, there are differences between the invoicing node and the actual project execution node. When hundreds or thousands of projects are carried out in parallel, the "accounts receivable" formed by financial invoicing is different from the business one. The actual "contract accounts receivable" will have a large deviation, an...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q40/00G06Q10/10
CPCG06Q40/125G06Q10/103
Inventor 郭亚雯袁磊曹瑞徐冲顾施思黄华夏扬沈晖张旗东沈轶奇朱维奇范应奇孙礼明孙志敏闫思佳伏晓玲董天夫左金建过群崔栋王力陈宙杜军高海忠海洋刘莉萍
Owner BAOSTEEL ENG & TECH GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More