Method suitable for changing ice layer displacement in high and cold reservoir area
A technology of reservoir area and ice layer, applied in water conservancy projects, artificial islands, underwater structures, etc., can solve problems such as insufficient bearing capacity, pier inclination, fatigue damage, etc., to avoid repetitive operations, avoid water operations, reduce Effects of security risks
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] A method suitable for changing the displacement of ice sheets in alpine reservoir areas, comprising the following steps:
[0041] Set up a concrete anchorage on both sides of the water surface in the reservoir area, and use an excavator to backfill and tamp the earth around the anchorage.
[0042]Fill sand in the floating bucket, close the lid after sand filling is completed, to ensure that water cannot enter, and a fixed ring is arranged on the top of the floating bucket, and the number of the fixed rings is two, and the two fixed rings are about the The center of the buoy is symmetrical, and there are two wire ropes, one of which passes through one of the fixing rings of the buoy in turn, and the other wire rope passes through the other fixing ring of the buoy in turn to realize the connection and fixation of the buoy, forming an isolated floating bring;
[0043] When fixing the concrete anchorage (or steel anchorage) on the steel wire rope, the steel wire rope can b...
Embodiment approach
[0046] A fixing device is set on the isolation floating belt, that is, a concrete anchor or a steel anchor is set on the isolation floating belt, and the distance between two adjacent fixing devices is 50m. Preferably, the fixing device and the isolation floating The belt is connected by a fixed rope, one end of the fixed rope is fixedly connected to the isolation floating belt, and the other end of the fixed rope is fixedly connected to the fixing device to realize the fixing of the isolation floating belt; as a preferred implementation According to the scheme, the fixed rope is a steel wire rope;
[0047] To ensure safety, the diameter of the steel wire rope should be ≥ 6mm.
[0048] The concrete anchorage or section steel anchorage is transported to the corresponding position by the pontoon, and fixedly connected with the isolation floating belt through the steel wire rope, and then thrown into the water to realize the fixing of the isolation floating belt; and the midpoint...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com