CrMn spring steel bloom and one-heating preparation method thereof
A technology of bloom and spring steel, which is applied in the field of CrMn spring steel bloom and its one-fired product preparation, can solve the problems of low cost, large compression ratio, high cost, etc., and achieve good effect of depth control
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] Using 250mm*300mm spring steel SUP9DZL continuous casting billet, rolled into diameter The standard SUP9D spring round steel process flow is: BOF converter smelting, LF refining furnace, RH treatment, bloom continuous casting, stack cooling, step-by-step continuous heating furnace heating (preheating section temperature: 650-660°C, heating section temperature : 860-890°C, second stage heating temperature: 1010-1020°C, soaking stage one temperature: 1080-1090°C, second soaking stage temperature: 1090-1100°C, final rolling temperature: 800°C total heating time: 187-190min .Gas: blast furnace gas, high-coke mixed gas), 20-pass rolling (10-pass initial rolling + 10-pass intermediate rolling), 4-pass pre-finish rolling, 4-pass KOCKS mill finish rolling, inspection, flaw detection (UT+ET), inspection, packaging, metering, storage.
[0026] The finished material produced by this process has excellent physical and chemical testing performance, good surface condition, and the ...
Embodiment 2
[0038] Using 250mm*300mm spring steel 55Cr3ZL continuous casting billet, rolled into diameter The standard 55Cr3 spring round steel process is: converter smelting, LF refining furnace, RH treatment, bloom continuous casting, stack cooling, step-by-step continuous heating furnace heating (preheating section temperature: 780-800 ℃, heating section temperature: 920-930℃, second heating stage temperature: 1060-1080℃, soaking first stage temperature: 1090-1100℃, soaking second stage temperature: 1110-1120℃, final rolling temperature: 860℃; total heating time: 215-228min .Gas: blast furnace gas, high-coke mixed gas), 20-pass rolling (10-pass initial rolling + 10-pass intermediate rolling), 4-pass pre-finish rolling, 4-pass KOCKS mill finish rolling, inspection, flaw detection (UT+ET), inspection, packaging, metering, storage.
[0039] The finished material produced by this process has excellent physical and chemical testing performance and good surface condition. The compression r...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com