Intelligent construction site management platform
A management platform and construction site technology, applied in the direction of data processing applications, instruments, resources, etc., can solve the problems of not being able to know the distance between workers and dangerous areas in advance, and can not be predicted, so as to achieve high accuracy and improve safety.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0076] The safety distance from the dangerous area in the data measuring unit is L, and the data measuring unit measures the maximum reference angle ε between the first step of the worker and the dangerous area, and the data measuring unit also measures the second distance of the worker The actual angle θ of the danger zone;
[0077] The safe distance from the dangerous area in the data measuring module is 100m, and the data measuring module also measures that a staff member walked 20m to the right from the safe distance of 80m, and at this time he is 30m away from the dangerous area, and his An angle ε has been generated in the dangerous area at this time, and the data measurement unit has also measured that the coordinates of the second step of the staff are (40,60) the angle θ from the dangerous distance, and the coordinates of the dangerous area are (500, 100);
[0078] According to the formula:
[0079]
[0080]
[0081]
[0082] After comparison, θ<ε, walking a...
Embodiment 2
[0084] The materials that should be required during the construction process are 10KG steel bars and 30KG cement soil. When the materials are unexpectedly cut off, the materials supplied are 6KG steel bars, and the unit price of the materials is 1000 / KG; the price that the materials should have been in the material risk estimate is D , the extra cost is Q, and try to control the risk within 30%;
[0085] According to the formula,
[0086] D=AE=1000*6=6000;
[0087] Q=(A-B)E=(10-6)*1000=4000;
[0088] Z=D+Q=6000+4000=10000;
[0089]
[0090] According to the above formula, the risk exceeds 10%, and the staff needs to compensate according to the price
[0091] Compensation costs = Z*(H-30%) = 1000
[0092] To sum up: According to examples 1 and 2, we can clearly understand the use of materials by using the material risk module, and can avoid some accidents.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology