Engineering project management system and management method, APP and storage medium

A technology of engineering project and management method, which is applied in the field of engineering project management, can solve the problems that the audited data cannot be traced, the progress of the engineering project cannot be supervised, and the procurement management cannot be performed, so as to shorten the project cycle, avoid untimely information update, The effect of reducing project cost

Inactive Publication Date: 2020-10-02
业达建设管理有限公司
View PDF6 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the existing engineering project management system app involves many processes in creating projects. When the above-mentioned method of formulating operation plans is adopted, it is easy to be caused by untimely information updates, information asymmetry, incomplete information, or human subjective factors (such as project managers) differences in experience) and other reasons, resulting in serious discrepancies between the formulated operation plan and the actual situation; at the same time, the audited data cannot be traced back
[0003] To sum up, the problems existing in the existing technology are: there are many processes involved in the app creation project of the existing engineering project management system. When the above-mentioned method of formulating the operation plan is adopted, it is easy to cause untimely information update, information asymmetry, and information Incomprehensible or human subjective factors (such as differences in experience of the project manager) and other reasons cause serious discrepancies between the formulated operation plan and the actual situation; at the same time, the audited data cannot be traced
At the same time, the existing engineering project management software or platform cannot automatically perform financial accounting, nor can it carry out procurement management, and cannot monitor the progress of engineering projects

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Engineering project management system and management method, APP and storage medium
  • Engineering project management system and management method, APP and storage medium

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0085] The engineering project management method provided by the embodiment of the present invention is as follows: figure 1 As shown, as a preferred embodiment, the project creation method provided by the embodiment of the present invention is as follows:

[0086] (1) Obtain the project planning parameter information of the target project by creating a program.

[0087] (2) According to the project planning parameter information, determine the processes that meet the starting conditions in the target project from a preset date.

[0088] (3) Determine the operation date of each process that meets the start-up conditions.

[0089] According to the embodiment of the present invention, when acquiring the project plan parameter information of the target project, it further includes: acquiring the basic information of the target project.

[0090] Alternatively, the acquiring the project plan parameter information of the target project includes: acquiring the basic information of ...

Embodiment 2

[0106] The engineering project management method provided by the embodiment of the present invention is as follows: figure 1 As shown, as a preferred embodiment, the audit method provided by the embodiment of the present invention is as follows:

[0107] 1) Obtain the documents submitted for review from the construction unit through the audit procedure, and the documents submitted for review include the project data and the amount submitted for review.

[0108] 2) Compare the engineering project data with the quotas and regulations in the database, and screen out the engineering project data with inconsistent comparison results.

[0109] 3) Store the rest of the engineering item data in the original data column in the calculation table, wherein the engineering item data stored in the original data column cannot be changed.

[0110] 4) Calculate the rest of the engineering project data according to the calculation table and the calculation rules in the quota and regulations to...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention belongs to the technical field of engineering project management, and discloses an engineering project management system, an engineering project management method, an APP and a storage medium. Creating an engineering project through the creation program; performing statistics on the engineering project data through a statistical program, performing engineering project financial accounting based on the engineering project planning table, and performing material accounting, labor cost accounting and other engineering project accounting; purchasing materials based on the material purchasing table and the material accounting table, and performing engineering construction progress management and control based on the engineering construction progress table; updating the engineeringproject data through an updating program based on the progress of the engineering project; estimating the engineering project value through a value estimation program; audit engineering projects. According to the invention, engineering project financial accounting can be carried out, and an engineering project accounting table is generated; and cost control, procurement management and project progress monitoring management are carried out.

Description

technical field [0001] The invention belongs to the technical field of engineering project management, and in particular relates to an engineering project management system, a management method, an APP and a storage medium. Background technique [0002] The engineering project is a project with engineering construction as the carrier, and it is a one-time engineering construction task as the object to be managed. It takes buildings or structures as the target output, and it needs to pay a certain fee, follow certain procedures, complete within a certain period of time, and should meet the quality requirements. However, the existing engineering project management system app involves many processes in creating projects. When the above-mentioned method of formulating operation plans is adopted, it is easy to be caused by untimely information updates, information asymmetry, incomplete information, or human subjective factors (such as project managers) experience difference) and...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q10/10G06Q50/08
CPCG06Q10/06316G06Q10/103G06Q50/08
Inventor 倪莉莉
Owner 业达建设管理有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products