Copper art sculpture structure and mounting method thereof
An installation method and copper art technology are applied to the structure of copper art sculptures and the field of installation, which can solve the problems of inconvenient management and maintenance of copper art sculpture boards, deformation of copper art sculpture plates, dislocation of copper art sculpture plates, etc., so as to avoid decorative effects. Effect of being affected, extending life, improving accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] Such as figure 1 and figure 2 As shown, a copper art sculpture structure according to the present invention includes an upper copper art piece 1, a lower copper art piece 2, a supporting rod body 3, two positioning assemblies 4, two shielding blocks 5, and several positioning rods 6 , among them, such as figure 1 , Figure 4 and Figure 5 As shown, the upper copper art piece 1 and the lower copper art piece 2 include a copper art plate 11 and a stainless steel plate 12, and the copper art plate 11 and the stainless steel plate 12 are arranged vertically, and the copper art plate 11 and the stainless steel plate The boards 12 are stacked and fixed side by side. The front surface of the copper art board 11 is provided with a decorative pattern 111, and the rear surface of the stainless steel board 12 is respectively provided with a vertically extending left embedded convex strip 121 and a right embedded convex strip 121. Install the convex strip 122, and make the lef...
Embodiment 2
[0038] Such as figure 1 , Figure 9 and Figure 10 As shown, the installation method of the copper art sculpture structure described in a kind of claim 1 of the present invention, comprises the steps:
[0039] (1) Prepare the copper art sculpture structure 100 and some screws 200 described in claim 1;
[0040] (2) Build or excavate or find the vertical wall 300;
[0041] (3) Arrange the supporting rod body 3 horizontally on the wall surface 300, and use some screws 200 to respectively pass through the fourth perforations 31 to fix the supporting rod body 3 on the wall surface 300;
[0042] (4) Arrange the two positioning assemblies 4 side by side, and make the lower end faces of the positioning rod bodies 41 in the two positioning assemblies 4 be pressed on the top surface of the supporting rod body 3;
[0043] (5) Arrange the positioning rods 6 between the two positioning components 4, and make the left T-shaped embedded head 61 embedded in the second T-shaped slot 418, a...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com