Construction structure and construction method for mounting large-diameter steel pipe through adopting shield tunnel

A shield tunneling and construction method technology, applied in the direction of tunnels, tunnel linings, safety devices, etc., can solve the problems of long steel pipe installation period, difficult track removal, and difficult construction, so as to simplify the construction process, ensure safety, and simple construction convenient effect

Pending Publication Date: 2020-06-19
URBAN MASS TRANSIT ENG CO LTD OF CHINA RAILWAY 11TH BUREAU GRP
View PDF0 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Aiming at the problems existing in the prior art, the present invention provides a construction method for installing large-diameter steel pipes using shield tunnels. This construction method can solve the need for disassembly and assembly of urban buildings when large-diameter pipes for municipal use are buried, and the construction is difficult and costly. It can also solve the problem that the installation of large-diameter steel pipes in shield tunnels needs to lay tracks due to transportation requirements. After the pipelines are transported in place, it is difficult to remove the tracks and the installation period of steel pipes is long.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction structure and construction method for mounting large-diameter steel pipe through adopting shield tunnel
  • Construction structure and construction method for mounting large-diameter steel pipe through adopting shield tunnel
  • Construction structure and construction method for mounting large-diameter steel pipe through adopting shield tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031] The present invention will be further described below in conjunction with drawings and embodiments. attached figure 1 and Figure 9 The accompanying drawings of the embodiments are drawn in a simplified manner, and are only used for the purpose of clearly and concisely illustrating the embodiments of the present invention. The following technical solutions shown in the accompanying drawings are specific solutions of the embodiments of the present invention, and are not intended to limit the scope of the claimed invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts all belong to the protection scope of the present invention.

[0032] In the description of the present invention, it should be understood that the orientations or positional relationships indicated by the terms "upper", "lower", "inner", "outer", "left", "right" etc. are based on those shown in the accomp...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a construction structure and a construction method for mounting a large-diameter steel pipe through adopting a shield tunnel. The construction structure comprises a steel pipe mounting tunnel formed by shield construction, the steel pipe and a concrete supporting structure, wherein the concrete supporting structure comprises a concrete pouring platform, an arc-shaped concrete base and a plurality of steel supports. The construction method is characterized in that before the steel pipe is transported, a track at the bottom of the shield tunnel is removed and cleared away,then concrete is poured to form the horizontal supporting platform, then the steel pipe is transported into the shield tunnel through trackless transportation equipment, and erected through the steelsupports, then a formwork is constructed again, steel bars are laid, and then the concrete is poured to form the arc-shaped concrete base covering the lower part of the steel pipe. According to the construction method, the shield tunnel is used for pipeline mounting, the influence on an urban building in the steel pipe burying process is avoided, the concrete pouring platform is adopted for steelpipe transportation, the disassembling and mounting process of the track is avoided, the construction process is simplified, the overall construction is convenient, and the construction period is greatly shortened.

Description

technical field [0001] The invention belongs to the field of underground pipeline installation, in particular to a construction method for installing large-diameter steel pipes by using a shield tunnel. Background technique [0002] With the continuous development of urban construction, more and more municipal pipelines are buried underground. Generally, the installation of underground pipelines is basically done by burying. However, for large-diameter urban water diversion steel pipes, due to the large diameter of the steel pipes, it is inconvenient to bury them. In addition, there are many urban buildings. The demolition requires a large amount of work, so the construction is difficult and costly. [0003] Pipeline installation in shield tunnels is often encountered in water conservancy projects, mining projects, petroleum, and nuclear power pipeline projects. However, for some heavy-duty pipelines with large diameters, due to the large volume of the pipeline and the circ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E03B7/02E03B7/09E21D11/00E21D11/08E21D11/10E21D11/38E21F16/02F16L1/036F16L1/06
CPCE03B7/02E03B7/09E21D11/00E21D11/08E21D11/10E21D11/383E21F16/02F16L1/036F16L1/06
Inventor 张志冰陈琦涛陈高良江涛张瑶何斌杰刘涛罗水保谭桂平谢强建
Owner URBAN MASS TRANSIT ENG CO LTD OF CHINA RAILWAY 11TH BUREAU GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products