Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Risk control model construction method and device, storage medium and terminal

A construction method and model technology, which is applied in the field of data processing, can solve problems such as large differences in the original model, loss of the original model in the new model, and little effect of adjustment of the risk control model, so as to reduce the speed of decay over time and ensure timeliness Effect

Pending Publication Date: 2020-05-15
深圳市分期乐网络科技有限公司
View PDF3 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] However, the scheme of adjusting the original risk control model through new data will have the following two problems: 1. The modeling of recent new data will cause the new model to lose the information of the original model, and the distribution of output scores will generally be different from that of the original model. The difference is quite large, and relevant personnel need to do detailed testing and adjustments on the use strategy; 2. Since the supervised model in the field of risk control generally uses the number of overdue days of 3 months or 6 months as the modeling target, this makes the latest proposal Model data need to have a length of time of 3 months or 6 months, and the variability of risk control data can often change greatly within this period (3 months or 6 months), making this risk Controlling model adjustments have little effect

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Risk control model construction method and device, storage medium and terminal
  • Risk control model construction method and device, storage medium and terminal
  • Risk control model construction method and device, storage medium and terminal

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0027] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, but not to limit the present invention. In addition, it should be noted that, for the convenience of description, only some structures related to the present invention are shown in the drawings but not all structures.

[0028] Before discussing the exemplary embodiments in more detail, it should be mentioned that some exemplary embodiments are described as processes or methods depicted as flowcharts. Although the flowcharts describe the steps as sequential processing, many of the steps may be performed in parallel, concurrently, or simultaneously. Additionally, the order of steps may be rearranged. The process may be terminated when its operations are complete, but may also have additional steps not included in the figure. The ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The embodiment of the invention discloses a risk control model construction method and device, a storage medium and a terminal. The method comprises the steps of obtaining historical data of at leastone user in a preset time period; extracting at least one type of first feature information related to the historical data; for each type of first feature information, sorting the first feature information in the historical data according to a preset sorting rule to generate a first feature information sequence; determining a first arrangement quantile of the first feature information in the firstfeature information sequence; and training a preset machine learning model based on the first arrangement quantile to generate a risk control model. By adoption of the technical scheme, the corresponding feature information is replaced with the arrangement quantiles of the feature information in the historical data; and model training is performed based on the arrangement quantiles of the featureinformation to generate a risk control model, so that the constructed risk control model can achieve a dynamic self-adaptive effect on the change of the input data, and the attenuation speed of the risk control model along with time is effectively reduced.

Description

technical field [0001] The embodiments of the present invention relate to the technical field of data processing, and in particular to a method, device, storage medium, and terminal for constructing a risk control model. Background technique [0002] In the field of risk control, due to the influence of the macroeconomic environment and company strategies, the target user groups and user characteristics of the risk control model have been changing, making the effect of the built risk control model gradually decrease or become invalid over time. Faced with this situation, it is usually a period of time to use new data to fine-tune the original model to meet business requirements. [0003] However, the scheme of adjusting the original risk control model through new data will have the following two problems: 1. The modeling of recent new data will cause the new model to lose the information of the original model, and the distribution of output scores will generally be different...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06N20/00
CPCG06Q10/0635G06N20/00
Inventor 钱信羽
Owner 深圳市分期乐网络科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products