Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!
An intelligent debugging training system and method for auxiliary power supply of urban railway passenger cars
What is Al technical title?
Al technical title is built by PatSnap Al team. It summarizes the technical point description of the patent document.
A technology for auxiliary power supply and training system, applied in vehicle energy storage, electric vehicles, vehicle components, etc., can solve the problems of not being able to understand the control principles of subway and light rail vehicles more deeply, restricting the operating skill level of debugging staff, and high cost
Active Publication Date: 2022-05-20
CRRC CHANGCHUN RAILWAY VEHICLES CO LTD
View PDF0 Cites 0 Cited by
Summary
Abstract
Description
Claims
Application Information
AI Technical Summary
This helps you quickly interpret patents by identifying the three key elements:
Problems solved by technology
Method used
Benefits of technology
Problems solved by technology
Because the cost of a single set of subway and light rail vehicles is about 5-30 million yuan, using the original vehicle for training is risky and costly, the production cycle is not allowed, there are many uncontrollable factors, and due to the limitation of the quality management process system, it is impossible to understand more deeply Control Principles of Subway and Light Rail Vehicles
The above situation seriously restricts the improvement of the operation skill level of the commissioning staff, and has become a restrictive factor for the production of subway and light rail vehicles
Method used
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more
Image
Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
Click on the blue label to locate the original text in one second.
Reading with bidirectional positioning of images and text.
Smart Image
Examples
Experimental program
Comparison scheme
Effect test
Embodiment Construction
[0039] figure 1 , the auxiliary power supply system of the urban railway bus intelligent debugging training system is distributed in three cabinets, of which the main control cabinet 1 and the main control cabinet 2 are mainly equipped with: touch display, central processing unit, battery control circuit, battery box, auxiliary power supply unit, low-voltage DC power distribution circuit, and medium-voltage AC power distribution circuit. The auxiliary power supply unit includes: auxiliary inverter external signal interface circuit, auxiliary inverter, medium-voltage AC power supply, and charger; the execution unit includes the first The high-voltage power supply circuit, medium-voltage AC power distribution circuit, and low-voltage DC power distribution circuit of switchboard 1; the high-voltage power supply circuit, medium-voltage AC power distribution circuit, low-voltage DC power distribution circuit, and medium-voltage expansion circuit of the third switchboard 3; the secon...
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More
PUM
Login to View More
Abstract
An intelligent debugging and training system for auxiliary power supply of urban railway passenger cars, including two main control units and an execution unit, the main control unit includes a touch display, a central processing unit, a battery control circuit, a battery box, an auxiliary power supply unit, and a low-voltage DC power distribution circuit , Medium-voltage AC power distribution circuit, wherein the auxiliary power supply unit includes: auxiliary inverter, auxiliary inverter external signal interface circuit, medium-voltage AC power supply, charger; the execution unit includes 4 switchboards, and the switchboard has high-voltage power supply Circuit, medium-voltage AC power distribution circuit, low-voltage DC power distribution circuit, and medium-voltage expansion circuit are organically integrated through the above-mentioned hardware, reflecting the control mode of the auxiliary power supply system of urban railway vehicles, with a high degree of simulation. , Write the debugging method, save time and effort, reduce the impact of training on the function and performance of the real vehicle, avoid unexpected quality problems of the vehicle, and reduce losses.
Description
technical field [0001] The invention belongs to the technical field of urban rail transit vehicle debugging and maintenance operation skills training, and in particular relates to an intelligent debugging training system for an auxiliary power supply system of urban rail vehicles, which satisfies the debugging skills of debugging employees for vehicle medium-voltage AC power supply and low-voltage DC power supply training. Background technique [0002] With the rapid development of China's urban rail transit, the equipment level and technical content of subway and light rail vehicles have reached the world's leading level. In the manufacturing process of subway and light rail vehicles, vehicle debugging is a key link, which is related to the normal realization of various functions of subway and light rail vehicles and the safe and reliable operation of subway and light rail vehicles. Therefore, there are high requirements for the skill level of employees in the commissionin...
Claims
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More
Application Information
Patent Timeline
Application Date:The date an application was filed.
Publication Date:The date a patent or application was officially published.
First Publication Date:The earliest publication date of a patent with the same application number.
Issue Date:Publication date of the patent grant document.
PCT Entry Date:The Entry date of PCT National Phase.
Estimated Expiry Date:The statutory expiry date of a patent right according to the Patent Law, and it is the longest term of protection that the patent right can achieve without the termination of the patent right due to other reasons(Term extension factor has been taken into account ).
Invalid Date:Actual expiry date is based on effective date or publication date of legal transaction data of invalid patent.