Road pavement maintenance construction method
A construction method and road surface technology, applied in the field of road construction, can solve the problems of early damage, the effective service time fails to reach the designed service life, etc., and achieves strong resistance to water damage, short maintenance and construction time, and good anti-seepage performance of the road surface. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0018] A road pavement maintenance construction method, it comprises the steps:
[0019] (1) Construction personnel inspect the road surface and record the damaged location and damage condition of the road surface;
[0020] (2) Mill the damaged pavement to form milling grooves, and remove loose cornerstones around them. The depth of the milling grooves reaches 15-22mm, and then clean the milling grooves;
[0021] (3) Heat the damaged part of the pavement to 180°C-200°C with microwaves, so that the moisture and air in the cracks inside the milling groove overflow, and fully dry the pavement with a steam pressure pump;
[0022] (4) Use needle injection sealant to block the internal cracks of the milling groove. After 3-4 hours, under the condition of maintaining 1750℃~190℃, spray 1.6~1.7kg / ㎡ on the surface of the milling groove evenly Lay SBS modified asphalt to make the surface wet without obvious liquid accumulation, and let it stand for 6-7 hours;
[0023] (5) Pave asphalt ...
Embodiment 2
[0026] A road pavement maintenance construction method, it comprises the steps:
[0027] (1) Construction personnel inspect the road surface and record the damaged location and damage condition of the road surface;
[0028] (2) Mill the damaged pavement to form milling grooves, and remove loose cornerstones around them. The depth of the milling grooves reaches 15-22mm, and then clean the milling grooves;
[0029] (3) Heat the damaged part of the pavement to 180°C-200°C with microwaves, so that the moisture and air in the cracks inside the milling groove overflow, and fully dry the pavement with a steam pressure pump;
[0030] (4) Use needle injection sealant to block the internal cracks of the milling groove. After 3-4 hours, under the condition of maintaining 1750℃~190℃, spread SBS evenly on the surface of the milling groove with a spraying amount of 1.6kg / ㎡ Modified asphalt to make the surface wet without obvious liquid accumulation, let stand for 6-7 hours;
[0031] (5) P...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com