Old concrete pavement widening transformation method
A technology for concrete pavement and old pavement, applied in the direction of roads, roads, pavement details, etc., can solve problems such as laborious, limited construction scope, surface reflection cracks, etc., to reduce uneven settlement, improve connectivity, and ensure overall force effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] Embodiment one: a kind of old concrete pavement widening reconstruction method comprises the following steps:
[0025] Step 1: Construction preparation, road widening 2. Foundation treatment.
[0026] Preparations for construction include:
[0027] 1. Investigate and check the topography, geology and structures of the construction site.
[0028] 2. Check that the performance of concrete transport vehicles, dump trucks, excavators, road rollers, concrete vibrating equipment, drilling equipment, etc. put into construction is normal and can meet the normal construction needs.
[0029] 3. Do a good job in the planning and procurement preparation of materials, compile various material plans, and formulate perfect management methods for the procurement, storage, storage and delivery of various materials.
[0030] 4. Do a good job of entering and accepting materials such as steel bars and graded gravel for planting bars 7. The grade and specification of the steel bars must m...
Embodiment 2
[0048] Embodiment 2, a method for rebuilding the width of an old concrete pavement, comprising the following steps:
[0049] Step 1: Construction preparation, road widening 2. Foundation treatment.
[0050] Preparations for construction include:
[0051] 1. Investigate and check the topography, geology and structures of the construction site.
[0052] 2. Check that the performance of concrete transport vehicles, dump trucks, excavators, road rollers, concrete vibrating equipment, drilling equipment, etc. put into construction is normal and can meet the normal construction needs.
[0053] 3. Do a good job in the planning and procurement preparation of materials, compile various material plans, and formulate perfect management methods for the procurement, storage, storage and delivery of various materials.
[0054] 4. Do a good job of entering and accepting materials such as steel bars and graded gravel for planting bars 7. The grade and specification of the steel bars must me...
PUM
Property | Measurement | Unit |
---|---|---|
Bending and tensile strength | aaaaa | aaaaa |
Bending and tensile strength | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com