Embodiment 1
[0032] A refining method of the LF furnace in the production of container steel in the CSP production line:
[0033] 1) After being smelted in the converter, it enters the LF furnace, and argon is blown at the double bottom, during which:
[0034] Use argon gas to blow through the large tank breathable brick, and the flow rate of argon gas is 1200L / min; after blowing through, adjust the flow rate of argon gas to 400L / min;
[0035] 2) Using one-time heating:
[0036] Heating for 9 minutes, the temperature is directly raised to 1625°C; the argon flow rate during the heating process is set at 250L / min;
[0037] 3) One-time slagging, desulfurization and alloy addition:
[0038] First, carry out slagging and desulfurization: adjust the flow rate of argon to 800L / min, add aluminum shot 1.0kg / ton steel, lime 5.0kg / ton steel, refining slag addition 0.28kg / ton steel, the time is 9min;
[0039] After 5 minutes of slagging and desulfurization, start to add ferrosilicon, ferromanganese...
Embodiment 2
[0047] A refining method of the LF furnace in the production of container steel in the CSP production line:
[0048] 1) After being smelted in the converter, it enters the LF furnace, and argon is blown at the double bottom, during which:
[0049] Use argon gas to blow through the large tank breathable brick, and the flow rate of argon gas is 1200L / min; after blowing through, adjust the flow rate of argon gas to 350L / min;
[0050] 2) Using one-time heating:
[0051] Heating for 8 minutes, the temperature is directly raised to 1625°C; the argon flow rate during the heating process is set at 350L / min;
[0052] 3) One-time slagging, desulfurization and alloy addition:
[0053] First, slagging and desulfurization: adjust the argon flow to 700L / min, add aluminum shot 0.8kg / ton steel, lime 4.0kg / ton steel, refining slag addition 0.25kg / ton steel, the time is 8min;
[0054] After 4 minutes of slagging and desulfurization, start to add ferrosilicon, ferromanganese, ferrophosphorus,...
Embodiment 3
[0062] A refining method of the LF furnace in the production of container steel in the CSP production line:
[0063] 1) After being smelted in the converter, it enters the LF furnace, and argon is blown at the double bottom, during which:
[0064] Use argon gas to blow through the large tank breathable brick, and the flow rate of argon gas is 1200L / min; after blowing through, adjust the flow rate of argon gas to 300L / min;
[0065] 2) Using one-time heating:
[0066] Heating for 9 minutes, the temperature is directly raised to 1630°C; the argon flow rate during the heating process is set at 300L / min;
[0067] 3) One-time slagging, desulfurization and alloy addition:
[0068] First, slagging and desulfurization: adjust the argon flow to 600L / min, add aluminum shot 0.7kg / ton steel, lime 4.5kg / ton steel, refining slag addition 0.25kg / ton steel, the time is 8min;
[0069] After 5 minutes of slagging and desulfurization, start to add ferrosilicon, ferromanganese, ferrophosphorus,...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com