Comprehensive construction method for pre-cut groove loop-sealing double-wall steel cofferdam deep water foundation
A double-wall steel cofferdam and deep-water foundation technology, applied in infrastructure engineering, construction, etc., to achieve the effects of reducing environmental hazards, shortening the construction period, and reducing construction difficulty and risks
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0048] The present invention takes the Mengxi-Central China railway coal transportation channel project as an example. The Ji'an Ganjiang Super Bridge site is located 9.6km downstream of the Jinggangshan Bridge in Ji'an City, and 4.6km downstream of the new Jinggangshan Bridge under construction. Starting and ending mileage: DK1867+993.480~DK1870+863.300, center mileage: DK1869+428.39, total length 2869.82m.
[0049] The bridge site crosses the Ganjiang River at DK1868+350.8~DK1869+350. The intersection angle between the river and the line is 95°. There are no embankments on both sides of the river. The river is open to navigation. It is currently a Class V channel and is planned to be a Class III channel with a clear navigation height of 10m. It is navigable for 1000t ships, and the highest navigable water level is taken as H=50.59m. At the bridge site across the Gan River: H1%=52.16m, Q1%=23347m3 / s, H2%=51.53m, Q2%=21400m3 / s, H5%=50.59m, Q5%=18600m3 / s, H10%=50.01 m, H20% =...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com