Subway foundation pit dewatering well with pressure reduction monitoring effect
A technology for dewatering wells and subways, applied in infrastructure engineering, excavation, construction, etc., can solve problems such as wasting groundwater resources, and achieve the effects of protecting safety, avoiding uplift damage, and avoiding losses
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] Such as figure 1 As shown, a subway foundation pit dewatering well with monitoring and decompression effect includes two parts, the water supply layer of the upper layer and the water filter layer of the lower layer, and the steel cage 6 is set in the well to run through the water supply layer and the water filter layer from top to bottom; The water supply layer is provided with a steel pipe 1 inside the steel cage 6, and clay 2 is filled outside the steel cage; the water filter layer is provided with a steel filter pipe 3 inside the steel cage 6, and a double-layer nylon cloth and a filter are arranged outside the steel cage 6. Material 4.
[0028] The dewatering well is set above the groundwater level, and the bottom of the dewatering well is 8.11-11.51m away from the groundwater level; the bottom of the dewatering well penetrates the underground aquifer 5 (8.11-11.51m away from the groundwater level).
[0029] In this example:
[0030] The steel pipe 1 of the water...
Embodiment 2
[0035] Such as figure 2 As shown, only the depth of the dewatering well in this embodiment is different from embodiment 1, and other features are the same as in embodiment 1. The bottom of the dewatering well is 0.01 ~ 8.11m away from the groundwater level line; the bottom of the dewatering well does not penetrate the underground septum Water layer 5 (8.11~11.51m away from groundwater level).
[0036] During the process of the project, the construction personnel used the water gauge to measure the water level in the dewatering well. According to the principle of the connector, the water level in the foundation pit is consistent with the water level in the dewatering well. Based on this, it can be judged whether the water level in the foundation pit exceeds the standard. Once it is found that the water level in the foundation pit exceeds the reasonable calculation value, the construction personnel will use the pump to pump the water out of the dewatering well in time, the wate...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com