Reinforcement method of shield tunnel segment
A shield tunnel segment and segment technology, which is applied to tunnels, tunnel linings, and earth-moving drilling and mining, etc., can solve the problems of complex tunnel reinforcement and high cost, and achieve the effects of fast construction, low cost and stable performance.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] Figure 1-Figure 2 It shows a reinforcement method for shield tunnel segments. Firstly, the inner wall of segment 1 in the shield tunnel reinforcement section is notched and chiseled, and the key areas of damage to the segment structure are generally chiseled at the capping block and joints. Remove the concrete protective layer to expose the stressed steel bar 3 in the shield tunnel segment; avoid the main steel bars of the segment, drill holes along the axial and radial distribution of the segment 1, inject reinforcement glue into the hole, and then implant positioning steel bars 5. The end of the positioning reinforcement bar 5 is the thickness mark of the sprayed ultra-high performance soil (UHPC), with a thickness of 50-100 mm; then the bound reinforcement mesh 4 is fixed on the stressed reinforcement bar 3 and the positioning reinforcement bar 5 by welding, and the reinforcement bar Mesh 4 includes axial steel bars 41 and circumferential steel bars 42; clean scum t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com