Drop integral raft foundation and construction method thereof
A technology of raft foundation and construction method, which is applied in infrastructure engineering, artificial islands, water conservancy projects, etc., can solve the problems of complex waterproof construction, low building tightness, and inability to meet high-level safety requirements, and achieve thermal insulation and waterproofing The construction is simple and easy, the difficulty of building construction is reduced, and the effect of saving consumables
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment 1
[0048] Specific embodiment 1 of the drop integral raft foundation provided by the present invention, in this embodiment, taking the "main building-podium" type tumor building for a hospital as an example on a soil layer with better bearing capacity such as mudstone, for this The specific structure and construction method of the drop integral raft foundation in the invention are introduced, specifically as follows:
[0049] Such as figure 1 As shown, the raft foundation includes the raft 1 of the main building and the raft 2 of the skirt building, the raft 1 of the main building is constructed with the shear wall 3 of the main building, and the raft 2 of the skirt building is connected with the shear wall 3 of the main building. A waterproof protection layer 4 is provided on the outside of the raft 1 of the main building, the raft 2 of the skirt building and the shear wall 3 of the main building. In addition, a concrete cushion 5 is provided on the lower side of the raft 1 of t...
specific Embodiment 2
[0060] The specific embodiment 2 of the drop integral raft foundation provided by the present invention is mainly different from embodiment 1 in that in embodiment 1, the sandstone cushion layer is arranged on the part of the podium raft adjacent to the shear wall of the main building and at the same time cooperate with the shear walls of the main building, rafts of the skirt building, supporting piles and crown beams. In this embodiment, the sandstone cushion layer is only arranged in the so-called area of the integrated connection structure, and the crown beam is supported and matched with the podium raft through an additionally arranged cushion layer.
specific Embodiment 3
[0061]The specific embodiment 3 of the drop integral raft foundation provided by the present invention is mainly different from embodiment 1 in that in embodiment 1, the sandstone cushion layer is arranged on the part of the podium raft adjacent to the shear wall of the main building and at the same time cooperate with the shear walls of the main building, rafts of the skirt building, supporting piles and crown beams. In this embodiment, sandstone cushions are only provided on the crown beam and podium rafts.
[0062] The specific embodiment of the construction method of the drop integral type raft slab foundation provided by the present invention:
[0063] The concrete embodiment of the construction method of the drop integral raft foundation is the same as the construction method of the drop integral raft foundation in Embodiments 1-3 of the above-mentioned drop integral raft foundation, and will not be repeated here.
PUM
Property | Measurement | Unit |
---|---|---|
Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com