An interconnected power grid and economic dispatching technology, applied in the electric power field, can solve the problems of transmission congestion, conservative scheduling decisions, unfavorable maximization of economic benefits of interconnected power grids, etc., and achieve the effect of alleviating transmission congestion and improving economies of scale.

Active Publication Date: 2017-05-17
RES INST OF ECONOMICS & TECH STATE GRID SHANDONG ELECTRIC POWER +1
View PDF9 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The economic dispatch of the interconnected grid mentioned in the above patents is an economic decision-making of power generation tracking load under the condition that the grid structure of each region remains unchanged. In fact, the modern smart grid topology is flexible and controllable, and has a certain optimization space. Neglecting this feature will inevitably lead to conservatism in dispatching decisions, which is not conducive to maximizing the economic benefits of the interconnected grid. If the traditional dispatching decision-making method under the fixed grid structure is still used, it is inevitable that there is no dispatching feasible solution
The Chinese patent with the patent application number of 201510213805.9: "A Power System Economic Dispatching Method Considering Power Grid Topology Optimization" provides a power system economic dispatch method considering power grid topology optimization. The joint decision-making of the operating status is conducive to excavating the potential factors to improve the economic benefits of dispatching, but it is realized in the isolated grid and does not involve the interconnected grid

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Interconnected power grid economical scheduling method taking power grid structure adjustment into consideration
  • Interconnected power grid economical scheduling method taking power grid structure adjustment into consideration
  • Interconnected power grid economical scheduling method taking power grid structure adjustment into consideration

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0019] Such as figure 1 As shown in , an economic scheduling method for interconnected power grids considering power grid structure adjustment, which specifically includes the following steps:

[0020] 1) Grid splitting, using N to mark the number of subsystems in the interconnected grid, reading in and preprocessing regional grid data, that is, given the cost coefficient and upper and lower limits of output of the conventional generator set, the reactance value of the transmission branch and the maximum transmission capacity, System load power, calculation parameters of renewable energy power generation;

[0021] 2) Initialize the calculation of the power grid in each partition, give the initial value of each decision variable, give the upper and lower limits of the voltage phase angle, set the maximum allowable number of disconnected transmission branches, and build an optimization model;

[0022] 3) Each sub-regional power grid conducts economic dispatch considering power ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

An interconnected power grid economical scheduling method taking power grid structure adjustment into consideration is provided. The method includes the following steps: 1) dividing power grids; 2) calculating initialization for one power grid in a subarea, giving decision variable initial values, giving voltage phase angle top and bottom limitation values, setting the greatest number of power transmission branches allowable to be on and off, and constructing an optimization model; 3) the power grids of the subareas concurrently carrying out economical scheduling that takes power grid structure adjustment into consideration; 4) a coordination center unit conducting global optimization for global variables as decision contents on the basis of local variables calculated by the power grids of the subareas, updating linking-up road power and boundary node phase angles; 5) according to local variable values decided in the step 3) and global variable values decided in the step 4), concurrently updating local dual variables of the power grids of the subareas; 6) determining whether conditions of convergence are satisfied; 7) determining whether the maximum number of times of iteration is reached; and 8) providing an optimal interconnected power grid scheduling scheme.

Description

technical field [0001] The invention relates to the technical field of electric power, in particular to an economic dispatching method of an interconnected power grid considering the structural adjustment of the power grid. Background technique [0002] The generation and consumption of electricity are different in time domain and region, and at the same time considering the complementarity of resources, safety and reliability, the interconnected grid was born. The economic dispatch of multi-regional interconnected power grids can achieve economies of scale and complementary cooperation with support capabilities such as frequency and voltage, and achieve a wider range of optimal allocation of resources. For a long time, in the economic dispatching of power system, the decision-making problem of power generation and load balance has been studied under the condition that the grid structure remains unchanged. Similar to the transportation network and computer network, there is...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): H02J3/48
Inventor 孙东磊杨金洪蒋佳音李雪亮刘晓明牛新生张杰杨波杨思吴奎华付一木
Owner RES INST OF ECONOMICS & TECH STATE GRID SHANDONG ELECTRIC POWER
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products