Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

A multi-stage temporary plugging deep network acid fracturing method

A deep network and acid fracturing technology, which is applied in earthwork drilling, wellbore/well components, production fluids, etc., can solve problems such as high corrosion resistance requirements, limited diversion of chemical temporary plugging agents, and complicated mechanical isolation operations. Achieve the effects of reducing seepage resistance, increasing single well production, and convenient operation

Active Publication Date: 2020-02-07
SOUTHWEST PETROLEUM UNIV +2
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In order to solve the existing oil and gas well layered acid fracturing problems such as high corrosion resistance requirements, complicated mechanical isolation operation and limited diversion of chemical temporary plugging agents, the present invention provides a multi-stage temporary plugging depth network acid fracturing method, Including: use the temporary plugging material liquid in the fracture to form a bridge plug in the artificial fracture, force the artificial fracture to form multiple branch cracks, and use the main acid to etch the crack; use the temporary plugging material liquid to form a bridge plug in the artificial fracture, Force the fracture to initiate at a new position on the borehole wall to realize interlayer diversion

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A multi-stage temporary plugging deep network acid fracturing method
  • A multi-stage temporary plugging deep network acid fracturing method
  • A multi-stage temporary plugging deep network acid fracturing method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0033] The technical solutions of the present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0034] see image 3 , the multi-stage temporary plugging deep network acid fracturing method provided by the embodiment of the present invention includes the following steps:

[0035] Step S1: According to the characteristic attributes of the reservoir, the amount and displacement of the pre-acid are set, and the pre-acid is injected into the formation to improve the liquid absorption capacity of the reservoir.

[0036] Reservoir characteristic attributes mainly include reservoir thickness and porosity and permeability characteristics. The dosage and displacement of the pre-acid are set according to the thickness of the reservoir and the characteristics of porosity and permeability. The purpose of injecting pre-acid is to dredge the reservoir near the wellbore, decontaminate and promote the formation liquid absorption, which...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a multi-stage temporary plugging depth network acid fracturing method, and belongs to the technical field of oil and gas well production increment and improvement. The method comprises the steps that bridge plugging is formed in an artificial fracture through fracture interior temporary plugging material liquid, the artificial fracture is forced to form multiple branch fractures, and main acid is used for etching the fracture; bridge plugging is formed in an artificial fracture opening through fracture opening temporary plugging material liquid, the fracture is forced to be cracked at the new position of a well wall, and interlayer steering is achieved. The multi-stage temporary plugging depth network acid fracturing method has the advantages of being simple in technology, convenient to operate and the like, a complex fracture network is formed in different permeability zones in carbonatite multi-layer, thick-layer or horizontal well long well sections through the principle of combining fluid power self serching and manual control, the oil and gas region communication probability is increased, the oil and gas percolating resistance is reduced, the single-well yield is improved, and a carbonate reservoir is efficiently and economically developed.

Description

technical field [0001] The invention relates to the technical field of oil and gas well stimulation and transformation, in particular to a multi-stage temporary plugging depth network acid fracturing method for increasing the productivity of carbonate rock oil and gas wells, which is used for repeated transformation of old wells and production stimulation of new wells. Background technique [0002] Fracturing and acidizing is one of the important stimulation techniques for carbonate reservoirs. In oil and gas wells with multiple layers, thick layers or long horizontal well sections, due to the large difference in permeability of each layer, the conventional full-well acidizing and fracturing of multiple oil (gas) layers can only stimulate one of the weak layers. Therefore, it is necessary to carry out transformation in layers to ensure the transformation of layers with low permeability. Currently, the techniques used include layered acid fracturing with plugging balls, pack...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21B43/27
CPCE21B43/26
Inventor 杨兆中李小刚孙俊唐诗国洪玉奎周长林曾斌敖科刘宇
Owner SOUTHWEST PETROLEUM UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products