Down-the-hole hammer and guide hole matched construction method for vibro-replacement stone column composite foundation
A technology for vibrating crushed stone piles and composite foundations, which is applied in infrastructure engineering, soil protection, construction, etc., can solve problems such as inability to meet construction requirements, achieve uneven settlement of foundations, reduce construction costs, and eliminate earthquake liquefaction. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0042] A method for constructing a composite foundation of a vibro-crushed stone pile with a down-the-hole hammer combined with a pilot hole, specifically comprising the following steps,
[0043] 1. Lead hole: According to the pile point set by the foundation, use the pneumatic down-the-hole hammer to penetrate the mountain riprap stratum and establish the lead hole;
[0044] 2. Move the machine: After a lead hole is established at a certain pile point, move the DTH hammer drilling rig to the next pile point, and continue to build the lead hole;
[0045] 3. Hole alignment: After establishing the pile point after the lead hole, let the vibro-pile machine be in place and place the vibrator into the lead hole;
[0046] 4. Hole forming: control the high-pressure water pump and vibrating device and form the hole to the set depth, where the water pressure is 0.4Mpa, and the vibrating hole-forming current is 50A;
[0047] 5. Cleaning the hole: first lift the vibrator out of the orif...
Embodiment 2
[0052]A method for constructing a composite foundation of a vibro-crushed stone pile with a down-the-hole hammer combined with a pilot hole, specifically comprising the following steps,
[0053] 1. Lead hole: According to the pile point set by the foundation, use the pneumatic down-the-hole hammer to penetrate the mountain riprap stratum and establish the lead hole;
[0054] 2. Move the machine: After a lead hole is established at a certain pile point, move the DTH hammer drilling rig to the next pile point, and continue to build the lead hole;
[0055] 3. Hole alignment: After establishing the pile point after the lead hole, let the vibro-pile machine be in place and place the vibrator into the lead hole;
[0056] 4. Hole forming: Control the high-pressure water pump and the vibrating device and form the hole to the set depth. The water pressure is 0.5Mpa, and the vibrating hole-forming current is 50A;
[0057] 5. Cleaning the hole: first lift the vibro-punch out of the orif...
Embodiment 3
[0062] A method for constructing a composite foundation of a vibro-crushed stone pile with a down-the-hole hammer combined with a pilot hole, specifically comprising the following steps,
[0063] 1. Lead hole: According to the pile point set by the foundation, use the pneumatic down-the-hole hammer to penetrate the mountain riprap stratum and establish the lead hole;
[0064] 2. Move the machine: After a lead hole is established at a certain pile point, move the DTH hammer drilling rig to the next pile point, and continue to build the lead hole;
[0065] 3. Hole alignment: After establishing the pile point after the lead hole, let the vibro-pile machine be in place and place the vibrator into the lead hole;
[0066] 4. Hole forming: Control the high-pressure water pump and the vibrating device and form the hole to the set depth. The water pressure is 0.6Mpa, and the vibrating hole-forming current is 50A;
[0067] 5. Cleaning the hole: first lift the vibro-punch out of the ori...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com