Phosphorus steel smelting method for a top-bottom combined blowing converter
A technology of top-bottom double blowing and smelting method, applied in the direction of manufacturing converters, etc., can solve the problems of low oxygen utilization rate, high cost of adding flux and alloy, long blowing time, etc., and achieves improved oxygen utilization rate, convenient control, The effect of shortening the smelting time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0025] The SPA-H steel grade is produced by the 260t converter with combined top and bottom blowing, and the smelting number is AD1872. The product composition is as follows according to the mass fraction requirements: C: 0.06-0.08% Si: 0.25-0.35% Mn: 0.40-0.50% P: 0.07-0.09% S: ≤0.008% By increasing the pressure of oxygen blowing, stirring at a low lance position, increasing the flow rate of bottom blowing gas and smelting with a very small amount of slag, the purpose of shortening the blowing time of the double blowing converter and quickly decarbonizing and maintaining phosphorus is realized.
[0026] The specific steps are as follows: the phosphorus content of molten iron is 0.098%, the phosphorus-containing steel is smelted using a double-blown converter, the oxygen supply pressure is 1.03Mpa, and the oxygen supply intensity is 3.6m 3 / (t.min); 3 minutes after the start of blowing, add active lime according to 7.5kg / t of steel, add light-burned dolomite according to 7.0kg / ...
Embodiment 2
[0030] The 09CuPCrNi-A steel grade is produced by a 260t converter with combined top and bottom blowing. The melting number is 14BD2351. The product composition is as follows according to the mass fraction requirements: C: 0.06-0.08% Si: 0.25-0.35% Mn: 0.40-0.50% P: 0.06-0.08 %S: ≤0.006% By increasing the oxygen blowing pressure, stirring at a low lance position, increasing the flow rate of bottom blowing gas and smelting with very little slag, the purpose of shortening the blowing time of the double blowing converter and quickly decarbonizing and maintaining phosphorus is realized.
[0031] The specific steps are as follows: the phosphorus content of molten iron is 0.08%, the phosphorus-containing steel is smelted using a double-blown converter, the oxygen supply pressure is 1.03Mpa, and the oxygen supply intensity is 3.6m 3 / (t.min); 3 minutes after the start of blowing, add active lime according to 7.1kg / t of steel, add light-burned dolomite according to 7.0kg / ton of steel, ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com