Construction method for existing supporting system connected into subway in complex geology and environment
A complex geological and systematic technology, applied in artificial islands, water conservancy projects, infrastructure projects, etc., to achieve the effects of increasing stability, saving costs, and reducing noise
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] (1) Select a point in the ground wall system to be built as the first axis point 1. The principle of selecting the first axis point is based on the actual situation of the site, in order to ensure that the construction period is not delayed, the first axis point is far away from the surrounding underground pipelines to be relocated At the same time, selecting the first axis point 1 can ensure that there is no impact of the built buildings around the ground wall to be constructed. Set the two intersecting surfaces of the original supporting ground connecting wall system of the original subway station and the ground connecting wall system to be built; the original supporting ground connecting wall system of the original subway station and the ground connecting wall system to be built Select one of the intersection surfaces closest to the first axis point as the first connection surface, and the other intersection surface as the second connection surface, and then construct ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com