Construction method of an underground vaulted roof
A construction method and arched roof technology, which can be used in earth drilling, mining equipment, tunnels, etc., can solve the problems of low section utilization, impact on road traffic, and many safety risks, so as to achieve low construction costs, speed up excavation progress, waste reduction effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0037] In order to clearly illustrate the technical features of this solution, the specific implementation of the present invention will be further described below according to the accompanying drawings.
[0038] A construction method for an underground vaulted roof, comprising the following construction steps:
[0039] a: Drill a groove 1 along the end profile of the prefabricated arched roof 2 on the tunnel section, the depth of the groove 1 is equal to the length of the prefabricated arched roof 2, see the schematic diagram figure 1 , figure 2 ;
[0040] b: Use hoisting equipment to help push the prefabricated arched roof 2 into the groove 1, so that the two sides of the prefabricated arched roof 2 overlap with the concrete precast piles 3 on both sides of the tunnel, and the concrete precast piles 3 are equipped with The corbel 4, the two sides of the prefabricated arched roof 2 are lapped on the corbel 4, the schematic diagram is shown in image 3 , Figure 4 ;
[0...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com