Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Hydropower station deterministic optimal operation method based on reference line

A technology for optimizing scheduling and hydropower stations, applied in data processing applications, instruments, calculations, etc., can solve problems such as poor interpretability of optimization results, lack of guiding significance, and difficult for dispatchers to understand, achieving strong executable and great guiding significance , the effect of increasing power generation

Active Publication Date: 2015-04-22
HUAZHONG UNIV OF SCI & TECH
View PDF1 Cites 10 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Although these methods can obtain optimal or near-optimal solutions, they are exhaustive in nature, and the optimization results are poorly interpretable and difficult for schedulers to understand, and what is obtained is only a solution of the problem rather than a set of rules. limited ability to direct
Affected by the cumulative deviation of hydropower station operation, load demand deviation and runoff forecast deviation, the operating state of the hydropower station will deviate from the original optimal plan. At this time, the original optimal plan has lost its optimality and has no guiding significance

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Hydropower station deterministic optimal operation method based on reference line
  • Hydropower station deterministic optimal operation method based on reference line
  • Hydropower station deterministic optimal operation method based on reference line

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0024] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not constitute a conflict with each other.

[0025] The energy involved in the power generation process of the hydropower station includes the initial energy storage, input energy, loss energy and output energy of the hydropower station. According to the law of energy conservation, when the initial energy storage and input energy of the hydropower station are constant, the less energy loss, the output power more. Based on the above princi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a hydropower station deterministic optimal operation method based on a reference line and belongs to the technical field of hydropower. The hydropower station deterministic optimal operation method comprises the following steps that (1) a scheduling period is determined, and constraint conditions in the scheduling period are set; (2) a reservoir deterministic long-term optimal operation maximum generating capacity model is established; (3) based on the principle of reducing abandoned water energy and the loss of entering energy, an anti-abandoned-water line and a minimum decision boundary line are obtained; (4) the anti-abandoned-water line is correspondingly adjusted, and the optimal operation reference line is determined; (5) according to the optimal operation reference line, an optimal decision is obtained and used for guiding operation of a hydropower station. According to the hydropower station deterministic optimal operation method, experience of an expert and a reservoir operation rule are fused, and the method can be easily understood and grasped by operation personnel; a corresponding decision can be made at any moment according to the current water storage state of the hydropower station, and the hydropower station deterministic optimal operation method has a higher executable performance and a greater guiding significance.

Description

technical field [0001] The invention belongs to the technical field of water conservancy and electric power, and more particularly relates to a deterministic optimal dispatching method for a hydropower station based on a reference line. Background technique [0002] Optimal scheduling of hydropower stations is a typical multi-objective, multi-stage nonlinear problem. In the long-term dispatching of hydropower stations, the maximum power generation model is usually established, and the dynamic programming method and its improved algorithm are used to solve the problem. The improved algorithm mainly includes step-by-step optimization method, dynamic programming successive approximation method, state-by-density dynamic programming method and incremental dynamic programming method. Wait. Although these methods can obtain optimal or near-optimal solutions, they are exhaustive in nature, and the optimization results are poorly interpretable and difficult for schedulers to underst...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q50/06
CPCG06Q50/06
Inventor 伍永刚徐囡陈佳刘兴龙
Owner HUAZHONG UNIV OF SCI & TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products