Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Baseband signal processing task parallelism real-time scheduling method based on multiple GPUs

A baseband signal processing and task scheduling technology, applied in the computer field, can solve the problems of DSP programming difficulty and poor flexibility.

Inactive Publication Date: 2014-11-19
NORTHWESTERN POLYTECHNICAL UNIV
View PDF3 Cites 18 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, DSP programming is difficult, and its flexibility is poor for constantly upgrading and changing mobile communication standards

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Baseband signal processing task parallelism real-time scheduling method based on multiple GPUs
  • Baseband signal processing task parallelism real-time scheduling method based on multiple GPUs
  • Baseband signal processing task parallelism real-time scheduling method based on multiple GPUs

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0031] An embodiment of the present invention provides a task scheduling method in baseband signal processing, such as figure 1 As shown, the method includes the following steps:

[0032] 101. The application sends a task to the scheduler, and the scheduler puts the task into a corresponding task queue according to the attribute of the task.

[0033] Such as figure 2 As shown, it is a block diagram of the system where the method provided by the embodiment o...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The embodiment of the invention provides a baseband signal processing task parallelism real-time scheduling method based on multiple GPUs, and belongs to the technical field of computers. The method can improve instantaneity and throughout capacity of baseband signal processing. The method includes the steps that an application sends tasks to a scheduler, and the scheduler places the tasks to corresponding task queues according to attributes of the tasks; the scheduler checks flag_GPU marks of the m GPUs periodically, and the number m' of the tasks needed by the m GPUs is obtained after checking; sequenced m' tasks are selected for the GPUs, and the m' tasks inherit preDevice attributes of the task queues which the m' tasks belong to; according to the preDevice attribute of each of the m' tasks, the m' tasks are distributed to a prefetched processor, and the GPUs execute the m' tasks; after the tasks are executed, the flags of the queues which the executed tasks belong to are set to be valid until all the task queues are empty.

Description

technical field [0001] The invention relates to the field of computer technology, in particular to a multi-GPU-based parallel real-time scheduling method for baseband signal processing tasks. Background technique [0002] In the process of baseband signal processing, the most frequently used signal modulation and transformation is vector dot multiplication, that is, "multiply-add" operation. Existing baseband signal processing is mainly realized by dedicated hardware DSP, and DSP can be used in The "multiply-add" operation is realized in one clock cycle. But DSP programming is difficult, and its flexibility is poor for the constantly upgrading and changing mobile communication standards. Contents of the invention [0003] Embodiments of the present invention provide a task scheduling method in baseband signal processing, which can improve the real-time performance and throughput of baseband signal processing. [0004] In order to achieve the above object, embodiments of ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06F9/48G06F9/50
Inventor 张羽郭丽杨刚王严杜三盛张策
Owner NORTHWESTERN POLYTECHNICAL UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products