Slag-based whole tailing gravity-flow filling cementing material and filling slurry preparation method thereof
A technology of cementing materials and filling slurry, which is applied in the direction of cement production, etc., can solve the problems of poor stability and high cost, and achieve the effects of improving early strength, increasing roof connection rate, and shortening setting time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1: preparation example 1
[0025] 69.97 parts of blast furnace slag, 15 parts of Portland cement clinker, 9 parts of hemihydrate gypsum (ie construction gypsum), 3 parts of dihydrate gypsum, 3 parts of quicklime with CaO content > 80%, 0.03% part of triethanolamine.
[0026] Mix the raw materials evenly according to the above ratio, put them into a ball mill, grind for 60 minutes, and measure its specific surface area to be 433m 2 / kg.
[0027] Finally, pack the ground cement material and keep it sealed.
Embodiment 2: preparation example 2
[0029] 59.96 parts of blast furnace slag, 15 parts of Portland cement clinker, 5 parts of hemihydrate gypsum (ie construction gypsum), 10 parts of dihydrate gypsum, 10 parts of quicklime with CaO content > 80%, 0.04% part of triethanolamine.
[0030] Mix the raw materials evenly according to the above ratio, put them into a ball mill, grind for 50 minutes, and measure its specific surface area to be 425m 2 / kg.
[0031] Finally, pack the ground cement material and keep it sealed.
Embodiment 3
[0032] Example 3: Preparation example 3 of self-flowing filling cementing material with full tailings
[0033] 78.95 parts of blast furnace slag, 5 parts of Portland cement clinker, 6 parts of hemihydrate gypsum (ie construction gypsum), 5 parts of dihydrate gypsum, 5 parts of quicklime with CaO content > 80%, 0.05% part of triethanolamine.
[0034] Mix the raw materials evenly according to the above ratio, put them into a ball mill, grind for 30 minutes, and measure the specific surface area to be 407m 2 / kg.
[0035] Finally, pack the ground cement material and keep it sealed.
PUM
Property | Measurement | Unit |
---|---|---|
Specific surface area | aaaaa | aaaaa |
Specific surface area | aaaaa | aaaaa |
Specific surface area | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com