Method used for reforming pile in underground space into pillar
A technology for underground space and piling, applied in building construction, building maintenance, construction, etc., can solve problems such as difficult changes and renovations, and achieve the effects of reducing material consumption, saving labor input, and speeding up construction progress
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0022] Further description will be given below in conjunction with the embodiments shown in the accompanying drawings.
[0023] During the excavation process for the new underground space (such as underground parking lot, basement, etc.) under the existing building, the piles buried in the soil 5 are gradually exposed, and the exposed parts of these piles need to be completely removed according to the conventional practice . However, building an underground space requires a lot of columns for support. In order to speed up the construction progress and reduce the construction cost, the inventor decided to transform the piles in the underground space into columns; the specific methods can be divided into the following two methods;
[0024] figure 1 In the shown embodiment, the transformation steps are as follows:
[0025] 1) Clean the exposed surface of the pile 1 first, and remove the loose pumice and dust on the exposed surface of the pile.
[0026] 2) Select two semi-annu...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com