Repair and reinforcement construction methods for segments in formed tunnel
A construction method and tunnel segment technology, which is applied in tunnels, tunnel linings, earthwork drilling and mining, etc., can solve problems such as tunnel segment fragmentation repair and reinforcement, and achieve the effect of meeting operational safety requirements
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0037] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0038] Such as figure 1 Shown, the forming tunnel segment repair of the present invention and reinforcement construction method, concrete construction method is as follows:
[0039] (1) Segment repair measures:
[0040] 1) Division of Fragmentation Areas
[0041] According to the actual situation of the construction tunnel and the width of the train, the damaged parts of the segment 6 are divided into three parts, namely, the tunnel vault top, the waists on both sides of the tunnel, and the tunnel arch bottom track bed. The repair measures for different parts need to be considered separately, as follows:
[0042] ① Tunnel vault position: the 100° range of the tunnel’s upper vault, that is, the downward projection range covers the connection between block D and block B of the tunnel segment;
[0043] ② Tunnel arch bottom ballast bed location: the 90°...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com