Method for quickly tunneling mine roadway and consecutively timbering mine roadway
A coal mine roadway, fast technology, applied in the direction of tunnels, tunnel lining, mining equipment, etc., can solve the problem that the construction speed cannot be fundamentally increased, and achieve the effect of shortening the initial support time, increasing the driving speed, and increasing the speed
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0012] The specific implementation manners of the present invention will be described in further detail below in conjunction with the accompanying drawings.
[0013] Depend on Figure 1-6 Provide, the present invention utilizes the device of coal mine roadway rapid excavation continuous support operation, then carry out according to the following steps:
[0014] 1) Drilling and anchoring cables: After the roadway is excavated with a fully mechanized excavator 7 or blasting, the roof 9 is laid with mesh 2, the anchor cable 16 is drilled and supported in time, the anchor cable tray 17 and lock 18 are installed, and the anchor cable tension gauge is used Apply a high pre-tightening force, the pre-tightening force is 2 / 5-3 / 5 of the breaking strength of the anchor cable 16; the position of drilling the anchor cable 16 is the key part of the stability of the roof 9, according to the stability of the roof 9, a five-flower arrangement is adopted Or arranged in parallel, each exca...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com