A multi-layer structure and pool technology, applied in basic structure engineering, configuration of water supply pools, buildings, etc., can solve the problems of lowering the foundation air pressure and resisting poor foundation deformation, so as to reduce the deformation of the bottom of the pool, resist foundation deformation, and facilitate construction simple effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] to combine Figure 1-Figure 6, the bottom of a multi-layer structure pool provided by the present invention is located below the ground, and the highest part of the excavation surface of the side wall of the pool is provided with a topping area 14 on the ground extension part of the non-excavation side; the upper part of the side wall of the pool is provided with a water inlet pipe 5. The overflow pipe 7, the water intake pipe 6 is arranged on the lower part of the side wall of the pool, and the underground drainage layer 1 is arranged under the bottom surface of the pool. A base cushion 2, an anti-seepage layer 3 and a protective layer 4 are provided; the structure of the underground drainage layer 1 is: a ring-shaped underground drainage ditch is arranged below the lowest point of the excavation surface along the side wall of the pool 11. There is at least one linear underground drainage ditch 12 below the excavation surface at the bottom of the pool. The two ends of ...
Embodiment 2
[0039] The construction method of the above-mentioned multi-layer structure pool comprises the following steps:
[0040] (1) Pool foundation excavation: at the selected construction site, excavate the pool foundation pit from the ground downwards, the side slope of the side wall excavation surface of the pool is a slope of 1:1, and the highest point of the side wall excavation surface faces The ground extension part on the non-excavation side is trimmed to a horizontal plane as the top pressing area 14;
[0041] (2) Construct underground drainage layer 1: Dig a ring-shaped underground drainage ditch 11 below the lowest part of the excavation surface along the side wall of the pool, and dig a linear underground drainage ditch 12 below the excavation surface at the bottom of the pool. The two ends of the culvert 12 are connected with the annular underground drainage culvert 11, and the circular underground culvert 11 and the linear underground drainage culvert 12 are all filled ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com