Resource-constrained project scheduling method based on multi-agent evolutionary algorithm
A resource-constrained, evolutionary algorithm technology, applied in the field of resource-constrained project scheduling based on multi-agent evolutionary algorithms, can solve problems such as poor stability, slow convergence speed, and inability to obtain project schedules
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] The resource-constrained project scheduling problem studied by the present invention refers to allocating limited resources to various tasks under the constraints of priority relations, and properly arranging the start time of these tasks to optimize some objectives. There are many kinds of resource-constrained project scheduling problems. What the present invention solves are single-project, single-mode, and single-objective resource-constrained project scheduling problems. The goal is to minimize the project duration. , J60 set, J120 set for testing.
[0026] refer to figure 1 , the specific implementation steps of the present invention are as follows:
[0027] Step 1. Parameter setting: P c is the neighborhood intersection probability, P m is the mutation probability, t is an integer greater than or equal to 0, representing the tth generation, L t Denotes the agent grid of generation t, L t+1 / 3 and L t+2 / 3 is L t and L t+1 Intermediate generation agent mesh ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com