Construction method of prestress common pipe ditch
A construction method and common management technology, applied in artificial islands, water conservancy projects, infrastructure projects, etc., can solve problems such as large hidden dangers of water leakage, large steel consumption, and troublesome construction process.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0034] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0035] Such as figure 1 , figure 2 , image 3 , Figure 4 , Figure 5 , Figure 6 , Figure 7 The construction method of the prestressed common trench of the present invention shown, it comprises the following steps.
[0036] a. Excavate the trench 1 for accommodating the prestressed common pipe trench.
[0037] b. Bind and fix the hoop-direction steel bars and the longitudinal or length-wise steel bars and lay the formwork. The longitudinal steel bars include non-prestressed steel bars and prestressed steel bars 2. Wherein, the rear ends of prestressed steel bars 2 in odd sections are warped outward, and the front ends of prestressed steel bars 2 in even sections are warped outwardly, and a sleeve is fixed to the warped end 2.1 of each prestressed steel bar 2 . There is a ring of water-stop steel plates 3 between the prestressed steel...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com