A production process and waterproof membrane technology, applied in thermal insulation, building insulation materials, layered products, etc., can solve the problem of bonding waterproof membranes and thermal insulation materials, affecting the performance and quality of waterproof insulation boards, waterproof membranes and thermal insulation Problems such as material peeling, to achieve the effect of solving the problem of easy peeling, short demoulding time, and shortening the construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0029] A production process of a waterproof and thermal insulation integrated board includes:
[0030] 1. Combine one side of the polymer waterproof membrane with a layer of non-woven fabric through adhesive, wherein the waterproof membrane includes the base waterproof membrane and the top waterproof membrane;
[0031] 2. Use preheating equipment to preheat the waterproof membrane to make the temperature reach the temperature required for the foaming chemical reaction. The preheating temperature is set at about 30°C;
[0032] 3. Polyurethane insulation material is compounded on the side of the base waterproof membrane compounded with non-woven fabric:
[0033] ①. Mixing of polyurethane insulation materials: send the material barrel to the constant temperature room one day in advance to adjust it to a suitable feeding temperature. ~26°C, while the pressure of the supply tank is kept at about 1.5 kg, and the pressure of the storage tank is kept at about 2 kg. At the same time,...
Embodiment 2
[0036] 1. After one side of the asphalt-based waterproofing membrane is laminated with a layer of HDPE through an adhesive, and then a layer of non-woven fabric is laminated, the waterproofing membrane includes a base waterproofing membrane and a top waterproofing membrane;
[0037] 2. Use preheating equipment to preheat the waterproof membrane to make the temperature reach the temperature required for the foaming chemical reaction. The preheating temperature is set at about 30°C;
[0038] 3. Polyurethane insulation material is compounded on one side of the grass-roots waterproof membrane compounded with HDPE and non-woven fabric:
[0039] ①. Mixing of polyurethane insulation materials: send the material barrel to the constant temperature room one day in advance to adjust it to a suitable feeding temperature. ~26°C, while the pressure of the supply tank is kept at about 1.5 kg, and the pressure of the storage tank is kept at about 2 kg. At the same time, the temperature of th...
Embodiment 3
[0042] A production process of a waterproof and thermal insulation integrated board includes:
[0043] 1. Combine one side of the polymer waterproof membrane with a layer of non-woven fabric through adhesive, wherein the waterproof membrane includes the base waterproof membrane and the top waterproof membrane;
[0044] 2. Use preheating equipment to preheat the waterproof membrane, and the preheating temperature is set at about 30°C;
[0045] 3. Compound the formed polyurethane board with an adhesive on the side of the grass-roots waterproof membrane compounded with non-woven fabric;
[0046] 4. On the surface of the polyurethane board, the top layer of waterproof membrane is bonded with an adhesive, and the side of the top layer of waterproof membrane compounded with non-woven fabric is bonded to the polyurethane board.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com