Main structure for metro long-span station and pillar arching construction method thereof

A main structure and long-span technology, applied in the direction of earth drilling, underground chambers, mining equipment, etc., can solve the problems of many processes, many initial support removals, weak support systems, etc., and achieve simple construction steps and convenient construction Effect

Active Publication Date: 2014-09-17
CHINA RAILWAY FIRST GRP CO LTD +1
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] To sum up, in the actual construction process, the above-mentioned "side hole method", "middle hole method" and "PBA hole pile method" all have the following defects and deficiencies to varying degrees: ① There are many pilot holes excavated, many processes, and many blasting times , so the stratum is disturbed many times, and there are many unsafe factors; ②The support is complex, the initial support is removed many times, and the amount of abandoned works is large; ③There are many connection points between the pilot tunnels, and the support system is relatively weak; ④The progress Slow, high cost, serious waste, and high cost; ⑤ "PBA hole pile method" is difficult to guarantee the verticality of the enclosure pile and the center column, which affects the structural force and appearance quality

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Main structure for metro long-span station and pillar arching construction method thereof
  • Main structure for metro long-span station and pillar arching construction method thereof
  • Main structure for metro long-span station and pillar arching construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0066] Such as figure 2The main structure of a long-span subway station is shown, including the main structure inside the station formed by excavation, and a plurality of center columns 1 arranged vertically on the longitudinal centerline of the main structure inside the station from front to back. , the middle plate 2 erected in the middle of the central column 1 and arranged horizontally and the main arch portion arranged directly above the internal main structure of the station, and a bottom longitudinal beam is arranged on the bottom longitudinal center line of the internal main structure of the station 3, and a top longitudinal beam 4 is arranged on the longitudinal center line of the arch of the main body, and the top longitudinal beam 4 is arranged in parallel with the bottom longitudinal beam 3 and is located directly above the bottom longitudinal beam 3 . The bottoms of the plurality of central pillars 1 are all supported on the bottom longitudinal beam 3 , and the t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a main structure for a metro long-span station and a pillar arching construction method thereof. The main structure comprises a station interior main structure, a plurality of middle pillars, a middle plate and a main arch part, wherein the station interior main structure is dug; the middle plate is located on the middle pillars; the main arch part is located right above the main structure; a bottom longitudinal beam is arranged at the bottom of the station interior main structure; a top longitudinal beam is arranged on the main arch part; and a middle longitudinal beam is arranged between adjacent middle pillars. The construction method comprises the following steps: 1) preparing in earlier stage; 2) digging a guiding hole and performing primary bracing and bridging construction; 3) constructing the bottom longitudinal beam, the middle pillars and the top longitudinal beam; 4) constructing a primary branch arch and refilling an arch back; 5) performing arch secondary lining construction; 6) digging the upper part of the main structure and constructing a primary branch of a side wall of the upper part; 7) performing secondary lining construction of the middle longitudinal beam, the middle plate and the side wall of the upper part; 8) digging the lower part of the main structure and constructing the primary branch of the side wall of the lower part; and 9) performing secondary lining construction for a base plate and the side wall of the lower part. The construction method provided by the invention has the advantages of reasonable design, simple construction step, convenience in realizing, small construction difficulty and high construction speed.

Description

technical field [0001] The invention belongs to the technical field of subway station construction, and in particular relates to a main structure of a large-span subway station and a column-arch construction method thereof. Background technique [0002] Since 1860, after more than 100 years of subway construction practice, on the basis of continuously absorbing advanced scientific and technological achievements, construction methods have been created to adapt to various surrounding rock conditions and environmental requirements, mainly including open cut method, cover excavation method, drilling method, etc. Explosion method, shallow burial and underground excavation method, shield method, immersed tube method, TBA method and jacking method, although the above construction methods can be effectively applied to the construction of subway stations and have their own advantages, but in the actual construction process All have certain defects and deficiencies in varying degrees....

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D13/00E21D13/02
Inventor 范恒秀李非昝向征王毅侯拉平张全利李兴盛姚德刚刘会轩吴耀华高永薛永锋贾贵宝黄锐白广斌王传嘉田海鹏张海洋
Owner CHINA RAILWAY FIRST GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products