SBS (styrene-butadiene-styrene) modified asphalt with stable thermal storage and preparation process thereof
A heat storage stable, modified asphalt technology, applied in the direction of building components, building insulation materials, buildings, etc., can solve the problems of high temperature stability of asphalt pavement, reduced high temperature performance of modified asphalt, can not meet the technical requirements and other problems, to achieve Improve the softening point, reduce the penetration, and reduce the effect of adding SBS
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] Example 1 Preparation of thermal storage stable SBS modified asphalt
[0025] Proceed as follows:
[0026] 1. Take 1000g Qilu No. 70 base asphalt and heat it to 180°C;
[0027] 2. Add 30g of aromatic oil and stir for 1 minute;
[0028] 3. Add 35g of 4303 model SBS and cut for 10 minutes;
[0029] 4. Add 1.2g of sulfur powder and cut for 10 minutes;
[0030] 5. Add 5g of polyphosphoric acid and stir for 2 hours to develop.
Embodiment 2
[0057] Proceed as follows:
[0058] 1. Take 1000g of Binhua No. 70 base asphalt and heat it to 180°C;
[0059] 2. Add 40g of aromatic oil and stir for 1 minute;
[0060] 3. Add 45g of 1301 model SBS and cut for 8 minutes;
[0061] 4. Add 1.5g of sulfur powder and cut for 8 minutes;
[0062] 5. Add 3g of polyphosphoric acid and stir for 140 minutes to develop.
[0063] The above-mentioned stirring speeds are all 60 revolutions / second, and the shearing speeds are all 7000 revolutions / second.
[0064] The experimental test index result of the modified asphalt prepared in embodiment 2 is shown in Table 3:
[0065] Table 3 Modified asphalt test test index list
[0066] indicators
[0067] What embodiment 2 used is the No. 70 base bitumen that penetration is less, and the compatibility with SBS modifier is poor, and SBS modifier uses the linear 1301 type SBS with better compatibility with bitumen, use embodiment 2 SBS modified asphalt segregation and other indicators...
Embodiment 3
[0069] Proceed as follows:
[0070] 1. Take 1000g Korean SK70 base asphalt and heat it to 180℃;
[0071] 2. Add 20g of aromatic oil and stir for 1 minute;
[0072] 3. Add 30g of 4303 model SBS and cut for 12 minutes;
[0073] 4. Add 1.1g of sulfur powder and cut for 12 minutes;
[0074]5. Add 7g of polyphosphoric acid and stir for 2 hours to develop.
[0075] The above-mentioned stirring speeds are all 70 revolutions / second, and the shearing speeds are all 6500 revolutions / second.
[0076] The test index result of the modified asphalt prepared by embodiment 3 is shown in Table 4:
[0077] Table 4 Modified asphalt test test index table
[0078] indicators
[0079] Example 3 uses No. 70 base asphalt with a large penetration and good compatibility with the SBS modifier, and the SBS modified asphalt segregation and other indicators used in Example 3 meet the specification requirements.
PUM
Property | Measurement | Unit |
---|---|---|
Extensibility | aaaaa | aaaaa |
Softening point | aaaaa | aaaaa |
Extensibility | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com