Method for rapidly plugging dike breach
A fast and plugging technology, used in flood control, water conservancy construction, and river management. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0020] The present invention will be further described below in combination with specific embodiments.
[0021] Example.
[0022] The materials to be utilized in this embodiment are ropes, planks, spiral anchors and iron wires, and the purpose is achieved through the following steps.
[0023] Step 1: Construction preparations, rush to build the bund head, make preparations for the sealing materials, personnel, and location, and at the same time, rush to build the bund head to prevent the entrance from continuing to expand.
[0024] Step 2: To build a cable bridge, use two or more ropes to connect the embankments on both sides of the crevasse, lay them flat and tighten them, place a plank on the ropes at intervals, fix the planks with iron wires, and form a cable bridge.
[0025] Step 3: Construct the fence. Insert a spiral anchor at intervals in front of the cable bridge. The distance between every two spiral anchors is less than the length of a sandbag to ensure that the san...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com