Method for increasing asphalt softening point
A technology of softening point and asphalt, applied in the processing of tar pitch/petroleum pitch/natural pitch, processing tar pitch/petroleum pitch/natural pitch by distillation, processing tar pitch/petroleum pitch/natural pitch by chemical methods, etc., can Solve the problems that the softening point of asphalt is difficult to meet the use requirements and the softening point is low, and achieve the effect of high softening point of the product, simple preparation process and short time consumption
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0020] Add petroleum asphalt with a carbon content of more than 50% to the reactor, and heat the reactor to 200°C to prepare molten asphalt; use a blower to blow the oxidant permanganate, which accounts for 5% of the amount of the asphalt, from the bottom of the reactor Potassium is fed into the reaction kettle to oxidize the molten asphalt at high temperature and at a high speed; the oxidized molten asphalt is added to the atomization conditioning tower at a temperature of 400°C, and flashed at high temperature; the flashed asphalt is The molten asphalt is input into an emulsifier at a temperature of 350°C, and an emulsifier is added for high-speed emulsification treatment; after cooling down to below 280°C, the material is discharged to obtain asphalt with a high softening point.
Embodiment 2
[0022] Add coal tar pitch with a carbon content of more than 50% into the reactor, and heat the reactor to 250°C to prepare molten pitch; use a blower to send the oxidant naphthalene, which accounts for 7% of the pitch, into the reactor from the bottom of the reactor In the reaction kettle, the molten asphalt is oxidized at high temperature and at a high speed; the oxidized molten asphalt is added to the atomization conditioning tower at a temperature of 450°C, and flashed at high temperature; the flashed molten asphalt is input into Add emulsifier to the emulsifier at 400°C for high-speed emulsification; cool down to below 300°C and discharge to obtain asphalt with high softening point.
Embodiment 3
[0024] Add natural asphalt with a carbon content of more than 50% into the reactor, and heat the reactor to 220°C to prepare molten asphalt; use a blower to send ozone, which accounts for 15% of the asphalt, into the reaction from the bottom of the reactor In the kettle, the molten asphalt is oxidized at high temperature and at a high speed; the oxidized molten asphalt is added to the atomization conditioning tower with a temperature of 450°C, and flashed at high temperature; the flashed molten asphalt is input into Add an emulsifier to the emulsifier at a temperature of 300°C for high-speed emulsification; cool down to below 270°C and discharge to obtain high softening point asphalt.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com