Tree-hole filler
A mixture and street tree technology, applied in the direction of fertilizer mixture, plant protection cover, application, etc., can solve the problems of easy evaporation of water, high cost, and lack of pruning
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
example 1
[0017] Example 1: Get twigs, grind and screen 80 kilograms of wood chips whose three-dimensional size is no more than 2.5cm, 4 kilograms of compound fertilizer, ZnSO 4 0.5 kg, FeSO 4 0.5 kg, 4 kg of phosphogypsum, 5 kg of acidic chemical modifier, 1 kg of green dye, stir well, spray 5 kg of adhesive, and mix thoroughly. Heating and molding with a pebble-shaped mold to make tree pit treasures with a minimum diameter of 3cm and a maximum diameter of 5cm, packed in a bag of 12kg. After being transported to the construction site, pave according to the specific depth of the planting pit, and the pavement thickness shall not be less than 15CM. After the workers are required to step on it with their feet, the coverage is slightly lower than the ground.
example 2
[0018] Example 2: Get 80 kilograms of cotton stalks for pulverization, 4 kilograms of compound fertilizer, ZnSO 4 0.2 kg, FeSO 4 0.1 kg, CaCO 4 2 kg, stir evenly; then add 6 kg of phosphogypsum, 2.5 kg of dyeing agent, stir thoroughly, add 7 kg of adhesive, mix and mold it into wood chips with a diameter of no more than 4 cm, and pack it in a bag of 12 kg after drying. After being transported to the construction site, pave directly in the planting pit. The pavement thickness shall not be less than 15CM. After the workers are required to step on it with their feet, the coverage is slightly lower than the ground.
example 3
[0019] Example 3: Take 30 kg of wheat straw, 30 kg of tree branches, 18 kg of wood processing residue (sawdust), crush and mix, 4 kg of compound fertilizer, ZnSO 4 1 kg, FeSO 4 1 kg, CaCO 4 1 kg; then add 5 kg of phosphogypsum, stir evenly, then add 3 kg of dyeing agent and stir thoroughly, add 7 kg of adhesive, mix, heat and mold it into a star-shaped tree pit treasure with a diameter of 8 cm, and pack it in a bag of 12 kg. After being transported to the construction site, a 10cm tree pit treasure is first paved in the planting pit, and then an iron tree fence is added on it.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com