Safety embedding in wall construction method of indoor fuel gas pipeline and accessory
A technology for gas pipelines and construction methods, which is applied in the directions of pipeline laying and maintenance, pipes/pipe joints/pipes, mechanical equipment, etc., can solve the problems of inconvenient installation, poor corrosion resistance, and unsightly appearance of valves and pipes in front of easy-to-modify stoves. Achieving the effect of avoiding gas leakage, good pressure resistance and beautiful appearance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] 1. Make a groove on the wall through which the gas pipe behind the gas meter passes. The groove should meet the requirements of 2.2.19 in the "Code for Construction and Acceptance of Urban Gas Indoor Engineering" CJJ94-2003, and the width is the outer diameter of the pipe plus 20 Mm
[0026] 2. Pave the gas pipeline in the groove, and use PE aluminum-plastic composite pipe for the gas pipeline. A trough-type hot-dip galvanized sheet protective cover is provided, and the enclosed space of the aluminum-plastic pipe in the cover is filled with refractory materials without gaps.
[0027] 3. Install the wall-buried stove front valve in the groove. One end of the gas pipeline in the groove is connected to the gas meter, and the other end is connected to the special stove front valve installed in the groove, and the other end of the stove front valve is connected to a hose , A buried wall sleeve is set at the outlet of the front valve of the stove to facilitate the connection of t...
Embodiment 2
[0030] In step two, it also includes: arranging effective partition materials for the parts where the buried pipe penetrates the floor and the wall. For example, the middle of the casing is filled with a flexible sealing material, and the two ends are smoothed with cement mortar to prevent gas blow-by at each gas location.
Embodiment 3
[0032] The following steps can be added to the steps of embodiment 1:
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com