New and old pavement connecting structure and construction process
A technology of pavement structure and old pavement, applied in the direction of roads, roads, pavement details, etc., can solve problems such as pavement damage, pavement cracking, separation, embankment cracking, etc., to prevent cracking, ensure service life, improve stability and reliability. sexual effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] Embodiment 1: a new and old pavement connection structure, including an old pavement structure and a new pavement structure, the old pavement structure is sequentially provided with a cement concrete pavement panel 1, a cement concrete base 2 and a cement concrete subbase 3 from top to bottom, and the cement concrete The length of the pavement panel 1, the cement concrete base 2 and the cement concrete subbase 3 extended to the new pavement structure increases layer by layer; The height of the side of the extension section 9 of the gravel base layer close to the old pavement structure is greater than the height of the side close to the new pavement structure; the connecting section is effectively connected by the extension section of the cement-stabilized gravel base layer, which is conducive to the stability of the foundation.
[0032] A connecting section is arranged between the old pavement structure and the new pavement structure, and a step surface is arranged on th...
Embodiment 2
[0035] Embodiment 2: adopt the construction technology of above-mentioned structural scheme, and the processing steps are as follows:
[0036] Step 1: Milling the old pavement structure
[0037] Determine the starting point of road milling according to the road connection line. The cement concrete pavement is 6 meters long from the road connection line, and the milling depth is the same as the cement concrete height. The cement concrete base is 23 meters long from the road connection line, and the milling depth is It is the height of cement concrete base 2 +5 to 10cm, and the road connection line coincides with the milling surface of cement concrete base 3;
[0038] Step 2: Gradually laying the cement stabilized gravel subbase and cement gravel base of the new pavement structure
[0039] First construct the cement stabilized gravel subbase to the upper surface of the milled cement concrete subbase 3, and to the boundary of the milling surface of the cement concrete base 2, th...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com