Regional energy station intelligent operation and maintenance system based on BIM+GIS and implementation method thereof

A technology of operation and maintenance system and implementation method, which is applied in the direction of system integration technology, information technology support system, instruments, etc., can solve the problems of low production management efficiency, inconvenient inspection and maintenance, and weak security prevention capabilities of regional energy stations. To facilitate load forecasting and analysis, solve the problem of low production management efficiency, and facilitate equipment operation monitoring and management

Pending Publication Date: 2022-01-18
CHANGJIANG SURVEY PLANNING DESIGN & RES
View PDF0 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] The purpose of the present invention is to address the deficiencies of the above technologies, to provide a BIM+GIS-based regional energy station intelligent operation and maintenance system and its implementation method, which integrates energy station production, maintenance, and security data, and builds an integrated Internet of Things+AI+3D display The standardized operation and maintenance mode can effectively solve the problems of low production management efficiency, inconvenient inspection and maintenance, and weak security prevention capabilities of regional energy stations

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Regional energy station intelligent operation and maintenance system based on BIM+GIS and implementation method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment approach

[0041] In this embodiment, the implementation method of the regional energy station intelligent operation and maintenance system based on BIM+GIS includes the following steps:

[0042] A) Build a BIM model and a GIS model. The BIM model includes the building, structure, and electromechanical three-dimensional models of the energy station building and the energy supply pipe gallery. The model information includes technical parameters such as equipment model, manufacturer, instruction, size, material, electrical, and mechanical. The GIS model includes the geographic model of the energy supply area, oblique photography model, external pipe network and surrounding building models, and the model information includes road information, building name, building location, building category, load category and demand;

[0043] B) Compile the data dictionary of the regional energy station operation and maintenance platform. The data dictionary classifies and encodes instructions, signals, a...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to the technical field of regional energy station management systems, and discloses a BIM+GIS based regional energy station intelligent operation and maintenance system, which comprises a BIM+GIS interaction system server and a display end, and also comprises a data storage server and a sensor subsystem layer. The BIM+GIS interaction system server is provided with a BIM+GIS model lightweight processing system and an operation and maintenance management system. The BIM+GIS model lightweight processing system is used for performing lightweight processing on the BIM model and the GIS model, and the operation and maintenance management system monitors and controls the data of the sensor subsystem layer acquired by the data storage server. The invention further discloses an implementation method of the regional energy station intelligent operation and maintenance system based on BIM+GIS. According to the regional energy station intelligent operation and maintenance system based on BIM+GIS and the implementation method thereof, production, maintenance and security data of the energy station are integrated, an Internet of Things + AI + three-dimensional display integrated operation and maintenance mode is established, and the problems that the regional energy station is low in production management efficiency, inconvenient to inspect and maintain and low in security protection capability are effectively solved.

Description

technical field [0001] The invention relates to the technical field of regional energy station management systems, in particular to a BIM+GIS-based regional energy station intelligent operation and maintenance system and its implementation method. Background technique [0002] Urban regional energy station is a regional cooling and heating solution in which water and electric energy synergize. Regional energy stations use renewable energy such as river water and geothermal energy to provide centralized cooling and heating to regional users, which can significantly improve energy utilization efficiency. [0003] However, the energy supply areas of regional energy stations are scattered, water, electricity, cooling and heating energy are concentrated, high-power equipment and facilities are complex, and most of them are underground projects, with high safety risks and difficult manual inspection and maintenance. [0004] Traditional regional energy station operation and maint...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/00G06Q50/06G06F30/13G06K9/62G06V10/80
CPCG06Q10/20G06Q50/06G06F30/13G06F18/24Y02E40/70Y04S10/50
Inventor 马启震桂树强杨艳李东阳陈泽望查麟周实李普惠胡文龙张家季
Owner CHANGJIANG SURVEY PLANNING DESIGN & RES
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products