Underground water beam type monitoring well and well completion method
A groundwater and monitoring well technology, applied in geophysical measurement, water testing, measuring devices, etc., can solve the problems of high cost of monitoring wells, cumbersome construction process, difficult implementation, etc., to ensure cleanliness and representativeness, and improve construction efficiency , Guarantee the effect of using strength and service life
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] see Figure 1 to Figure 5 As shown, a groundwater beam type monitoring well provided by the embodiment of the present invention includes a plurality of monitoring tubes 1, and a plurality of monitoring tubes 1 are inserted into the borehole 5 together, and the upper surfaces of the plurality of monitoring tubes 1 are flat. and a plurality of monitoring pipes 1 have different lengths, and each of the monitoring pipes 1 corresponds to a corresponding aquifer; a water-stop structure 3 is arranged between two adjacent monitoring pipes 1 for filling The gap between the plurality of monitoring tubes 1; the filtering structure 2 is arranged at the bottom of each monitoring tube 1, and the length of the filtering structure 2 is equal to the thickness of the monitoring layer.
[0034]By setting a water-stop structure 3 in the gap between two adjacent monitoring tubes 1, the water-stop structure 3 not only fills the gap between two adjacent monitoring tubes 1, but also ensures th...
Embodiment 2
[0045] The present invention also provides a method for forming a groundwater beam type monitoring well, comprising the following steps: Step 1: drilling 5 cores at monitoring points, and determining the formation conditions and the starting and ending depths of each monitoring layer, and, the The radius of the borehole 5 is 50mm-100mm larger than the radius of the monitoring tube 1; Step 2: fill the gaps of the multiple monitoring tubes 1 with a water-stop structure 3, tighten the multiple monitoring tubes 1, and ensure that multiple The upper surface of the monitoring tube 1 is even, the projection of the monitoring tube 1 is fan-shaped, and a plurality of the monitoring tubes 1 are spliced together to form a ring structure. Step 3: Insert a plurality of monitoring tubes 1 into the borehole 5 to perform layered gravel filling and water stop; Step 4: Pump and wash each monitoring tube 1 in sequence until the groundwater is drained Turbidity becomes clear.
[0046] The spec...
PUM
Property | Measurement | Unit |
---|---|---|
thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com