Leaking stoppage and drainage method for tunnel crossing water-rich area
A technology for tunnels and areas, applied in the direction of drainage, tunnels, tunnel linings, etc., can solve problems such as unsatisfactory results, failure to effectively block leakage channels, lack of
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0028] A method for plugging and draining tunnels through water-rich areas, comprising the following construction steps:
[0029] (1) Determine the surrounding rock area above the inverted arch structure within the tunnel construction range that needs to be plugged, carry out all-round hollow grouting bolt construction, and select the area with a large water output in the surrounding rock area that needs to be plugged. Grouting plugging;
[0030] (2) Use plugging materials to repair the cracks where dripping or water seepage has occurred on the surface of the surrounding rock area above the inverted arch structure that needs to be plugged;
[0031] (3) The surrounding rock area to be plugged above the inverted arch structure is covered with internal drainage grids, the internal drainage grids are fixedly connected to the hollow grouting bolts, and the internal drainage grids face the side of the tunnel center There is a composite material water-proof layer on it;
[0032] (4...
Embodiment 2
[0043] A method for plugging and draining tunnels through water-rich areas, comprising the following construction steps:
[0044] (1) Determine the surrounding rock area above the inverted arch structure within the tunnel construction range that needs to be plugged, carry out all-round hollow grouting bolt construction, and select the area with a large water output in the surrounding rock area that needs to be plugged. Grouting plugging;
[0045] (2) Use plugging materials to repair the cracks where dripping or water seepage has occurred on the surface of the surrounding rock area above the inverted arch structure that needs to be plugged;
[0046] (3) The surrounding rock area to be plugged above the inverted arch structure is covered with internal drainage grids, the internal drainage grids are fixedly connected to the hollow grouting bolts, and the internal drainage grids face the side of the tunnel center There is a composite material water-proof layer on it;
[0047] (4...
Embodiment 3
[0071] A method for plugging and draining tunnels through water-rich areas, comprising the following construction steps:
[0072] (1) Determine the surrounding rock area above the inverted arch structure within the tunnel construction range that needs to be plugged, carry out all-round hollow grouting bolt construction, and select the area with a large water output in the surrounding rock area that needs to be plugged. Grouting plugging;
[0073] (2) Use plugging materials to repair the cracks where dripping or water seepage has occurred on the surface of the surrounding rock area above the inverted arch structure that needs to be plugged;
[0074] (3) The surrounding rock area to be plugged above the inverted arch structure is covered with internal drainage grids, the internal drainage grids are fixedly connected to the hollow grouting bolts, and the internal drainage grids face the side of the tunnel center There is a composite material water-proof layer on it;
[0075] (4...
PUM
Property | Measurement | Unit |
---|---|---|
Compressive strength | aaaaa | aaaaa |
Bond strength | aaaaa | aaaaa |
Impermeability pressure | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com