Parallel four-main-cable cable-crossing crane and using method thereof
A parallel four and cross-cable technology, which is applied in the direction of traveling mechanism, cable crane, hoist, etc., can solve the problems of unsuitable hoisting requirements of four main cable suspension bridges
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] Such as Figure 1~4 As shown, the present invention provides a kind of parallel four main cable cross-cable crane, comprises support on the cable and walking system, hoisting system, main truss 8 and control system, described support on the cable and walking system and hoisting system are two One, two cable support and walking systems are respectively arranged in parallel at the two ends of the main truss 8 through the hoisting system.
[0036] Further, the above-mentioned cable support and walking system includes two sets of walking mechanisms, traction mechanisms, connecting shaft boxes 11 and parallel structures 16, the two sets of running mechanisms are arranged in parallel and are fixedly connected by the parallel structure 16 between them. The upper ends of the group walking mechanism are also hinged with the connecting shaft box 11 through the transverse pin shaft 19; the traction mechanism is arranged on the parallel structure 16.
[0037] Further, the traction...
Embodiment 2
[0048] On the basis of embodiment 1, a kind of using method of the parallel four main cable spanning crane of the present invention, concrete steps are:
[0049] Step 1: Install the upper cable support and walking system, hoisting system, and main truss 8 at the predetermined position of the formed main cable, start the load transfer cylinder of the traveling mechanism, and move the traveling rollers up to the hoop body of the traveling mechanism to support on the top of the main cable face, tighten the hoop body, and the piston of the load transfer cylinder continues to shrink, so that the traveling roller is separated from the main cable;
[0050] Step 2: The main lifting jack of the hoisting system lowers the steel strand and connects the shoulder beam with the stiffening beam directly below the crane (usually transported by water), starts the main lifting jack, lifts the stiffening beam into place, and connects the stiffening beam with the crane cable connection to complet...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com