Construction method for prefabricated box girder in high-cold and high-altitude area
A high-altitude box girder construction technology, applied in manufacturing tools, ceramic molding machines, etc., can solve the problems of large temperature difference between day and night, difficulty in guaranteeing the quality and efficiency of box girder construction, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0050] The following is attached Figure 1-6 , please elaborate further.
[0051] The embodiment of the present application discloses a construction method of a prefabricated box girder in an alpine and high-altitude area. The construction method of prefabricated box girders in high-cold and high-altitude areas includes the following steps:
[0052] step one,
[0053] Construct a closed steel structure greenhouse, in which the columns and main beams are welded with round pipes to form a truss structure, the purlins are made of square pipes, and the sides and roof are made of color steel.
[0054] Pouring beam-making pedestal 1: Bind the pedestal reinforcement cage at the design position of beam-making pedestal 1 in the closed steel structure shed, install and fix the embedded parts, and arrange welding and fixing in the pedestal reinforcement cage along the length direction of the pedestal reinforcement cage at intervals of 2.5m Plate 12 and fixed screw rod 11, fixed screw ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com