Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Novel construction method for upper structure of multi-chamber continuous UHPC box girder bridge

A construction method and technology of box girders, which are applied to bridges, bridge materials, bridge construction, etc., can solve problems such as steel strand breakage and wire slipping, large construction quality control problems, and concrete appearance defects at the bottom of the beam, and achieve relief The effect of structural self-weight, long service life and easy guarantee of construction quality

Active Publication Date: 2020-11-03
ARCHITECTURAL DESIGN RES INST OF GUANGDONG PROVINCE
View PDF14 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] 2. Long construction period: cast-in-place continuous box girder needs a series of processes such as steel bar binding, formwork erection, concrete pouring, etc.
[0005] 3. The problem of construction quality control is serious: the quality control of cast-in-place continuous box girder is a difficult problem in the construction process. If it is not handled properly, many problems will arise, such as cracks caused by concrete drying shrinkage, steel strand breakage and Slipping wire phenomenon and appearance defects of concrete at the bottom of the beam, etc., serious safety accidents caused by formwork and support system

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Novel construction method for upper structure of multi-chamber continuous UHPC box girder bridge
  • Novel construction method for upper structure of multi-chamber continuous UHPC box girder bridge
  • Novel construction method for upper structure of multi-chamber continuous UHPC box girder bridge

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0036] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0037] see Figure 1-9, a new multi-chamber continuous UHPC box girder bridge superstructure construction method, its structure includes UHPC prefabricated longitudinal block center girder 1, UHPC prefabricated longitudinal block side beam 2 and prefabricated steel connector 4; the UHPC prefabricated longitudinal block The block center beam 1 and the UHPC prefabricated longitudinal block side beam 2 constitute the main beam 14 of the simply supported system. ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a novel construction method for an upper structure of a multi-chamber continuous UHPC box girder bridge. The method invloves UHPC prefabricated longitudinal block middle beams,UHPC prefabricated longitudinal block boundary beams, cast-in-place UHPC joints, prefabricated steel connecting pieces, shear nails, embedded steel base plates, embedded bolts, temporary supports, permanent supports, stiffening cross beams, cast-in-place UHPC bottom plates, cast-in-place UHPC webs, cast-in-place UHPC top plates, thickening areas, simply supported system main beams, stiffening cross beam bottom plates and main beam webs. The method has the beneficial effects that multi-chamber UHPC box girders are longitudinally partitioned for prefabrication and are spliced and connected through the specially-made connecting pieces on site, a plurality of multi-chamber simply-supported box girders are formed firstly, and then the box girder structure is changed from a simply-supported mode to a continuous mode through a special pouring mode on the pier. The structure is excellent in quality, reliable in splicing, good in stress performance and durability, convenient to construct, capable of greatly shortening the construction period and saving the under-bridge space, and very suitable for the requirements of construction and development.

Description

technical field [0001] The invention relates to a construction method of a box girder bridge, in particular to a novel multi-chamber continuous UHPC box girder bridge superstructure construction method, and belongs to the technical field of connection structure and construction of a main girder at a bridge pier and a prefabricated beam. Background technique [0002] In urban bridges, prestressed concrete continuous wide box girder bridges are often used in the construction of urban bridges due to their excellent mechanical performance, good integrity, and beautiful appearance. However, due to the large overall volume and heavy overall weight of the wide box girder, prefabricated hoisting cannot be carried out for construction. At present, the construction method of on-site pouring is mainly used, and only a small part of the narrow box girder is constructed through prefabricated assembly. However, with the rapid development of the city, the urban traffic network is becoming ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E01D21/00E01D2/04
CPCE01D2/04E01D21/00E01D2101/268
Inventor 李巍霍文斌王健张阳胡智敏饶欣频陈伟黄龙田梁茂平李炼
Owner ARCHITECTURAL DESIGN RES INST OF GUANGDONG PROVINCE
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products